X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605201103000

Well Details

Well ID: 0605201103000
Loading map...
Location: 00/03-11-060-20W5/0
Location Alias: 00/03-11-60-20 W5M
Location Alias 2: 00/03-11-060-20 W5/00
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 20
Section: 11
County/Municipality: Municipal District of Greenview No. 16
Well Name: TRILOGY HZ KAYBOBS 3-11-60-20
Operator Name: Paramount Resources Ltd.
License Number: 0405936
License Date: 2008-12-11
License Status: Issued
Spud Date: 2009-01-06
Final Drill Date: 2009-02-02
Well Total Depth: 3403.00 m
Surface Hole Latitude: 54.169979
Surface Hole Longitude: -116.868116

For data sources see[1][2]

Well History

Date Event
2008-12-11 Obtained License
2009-01-08 Surface Casing Operation Performed
2009-01-10 Direction Drilling Operation Performed - Horizontal
2009-01-24 Intermediate Casing Operation Performed
2009-02-01 Well Log Performed
2009-02-02 Finished Drilling
2009-02-02 Liner Casing Operation Performed
2009-02-02 Well Log Performed
2009-02-02 Well Mode changed to Drilled and Cased
2009-02-03 Rig Released
2009-02-09 Well Log Performed
2009-02-11 Perforation Treatment Performed - Multi-Stage Fracture
2009-02-11 Perforation Treatment Performed - Open-Hole Completion
2009-02-12 Well Began Production
2009-02-12 Well Fluid changed to Gas
2009-02-12 Well Mode changed to Flowing
2014-03-01 Well Fluid changed to Gas
2014-03-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2009-01-10 861.70 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-02-11 Open Hole/Barefoot Completion 3368.30 3403.00 0
2009-02-11 Multi-Stage Fracture 3359.60 3359.70 0
2009-02-11 Multi-Stage Fracture 3272.20 3272.30 0
2009-02-11 Multi-Stage Fracture 3142.00 3142.10 0
2009-02-11 Multi-Stage Fracture 3012.00 3012.10 0
2009-02-11 Multi-Stage Fracture 2853.50 2853.60 0
2009-02-11 Multi-Stage Fracture 2732.90 2733.00 0
2009-02-11 Multi-Stage Fracture 2621.80 2621.90 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 7229 0.0 0.0 0.0
2010 8491 0.0 0.0 0.0
2011 7380 0.0 0.0 0.0
2012 8471 0.0 0.0 0.0
2013 5711 0.0 0.0 0.0
2014 7320 0.0 0.0 0.0
2015 8255 0.0 0.0 0.0
2016 4872 0.0 0.0 0.0
2017 7440 0.0 0.0 0.0
2018 8159 0.0 0.0 0.0
2019 8303 0.0 0.0 0.0
2020 935 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2009-02-18 No Incident Encountered 0.00 0.00

For data sources see[7]

References