X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605200212020

Well Details

Well ID: 0605200212020
Loading map...
Location: 02/12-02-060-20W5/0
Location Alias: 02/12-02-60-20 W5M
Location Alias 2: 02/12-02-060-20 W5/00
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 20
Section: 02
County/Municipality: Municipal District of Greenview No. 16
Well Name: TRILOGY HZ 102 KAYBOBS 12-2-60-20
Operator Name: Paramount Resources Ltd.
License Number: 0418579
License Date: 2010-02-12
License Status: Issued
Spud Date: 2011-01-04
Final Drill Date: 2011-01-27
Well Total Depth: 4220.00 m
Surface Hole Latitude: 54.164564
Surface Hole Longitude: -116.871151

For data sources see[1][2]

Well History

Date Event
2010-02-12 Obtained License
2011-01-07 Surface Casing Operation Performed
2011-01-11 Well Log Performed
2011-01-16 Direction Drilling Operation Performed - Horizontal
2011-01-18 Intermediate Casing Operation Performed
2011-01-27 Finished Drilling
2011-01-27 Well Mode changed to Drilled and Cased
2011-01-31 Liner Casing Operation Performed
2011-02-02 Rig Released
2011-02-14 Well Log Performed
2011-03-22 Perforation Treatment Performed - Multi-Stage Fracture
2011-03-22 Perforation Treatment Performed - Open-Hole Completion
2011-03-27 Well Began Production
2011-03-27 Well Fluid changed to Gas
2011-03-27 Well Mode changed to Flowing
2011-10-27 Well Log Performed
2019-03-14 Well Fluid changed to Gas
2019-03-14 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-01-16 2414.10 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-03-22 Open Hole/Barefoot Completion 4216.00 4220.00 0
2011-03-22 Multi-Stage Fracture 3624.50 3703.00 0
2011-03-22 Multi-Stage Fracture 3557.90 3624.40 0
2011-03-22 Multi-Stage Fracture 3479.30 3557.80 0
2011-03-22 Multi-Stage Fracture 3401.00 3479.20 0
2011-03-22 Multi-Stage Fracture 3334.30 3400.90 0
2011-03-22 Multi-Stage Fracture 3255.90 3334.20 0
2011-03-22 Multi-Stage Fracture 3177.60 3255.80 0
2011-03-22 Multi-Stage Fracture 3110.90 3177.50 0
2011-03-22 Multi-Stage Fracture 3032.80 3110.80 0
2011-03-22 Multi-Stage Fracture 2865.50 3032.70 0
2011-03-22 Multi-Stage Fracture 4194.50 4220.00 0
2011-03-22 Multi-Stage Fracture 2733.40 2865.40 0
2011-03-22 Multi-Stage Fracture 2618.60 2733.30 0
2011-03-22 Multi-Stage Fracture 2491.80 2618.50 0
2011-03-22 Multi-Stage Fracture 4138.30 4194.40 0
2011-03-22 Multi-Stage Fracture 4072.10 4138.20 0
2011-03-22 Multi-Stage Fracture 3993.80 4072.00 0
2011-03-22 Multi-Stage Fracture 3927.50 3993.70 0
2011-03-22 Multi-Stage Fracture 3848.60 3927.40 0
2011-03-22 Multi-Stage Fracture 3769.60 3848.50 0
2011-03-22 Multi-Stage Fracture 3703.10 3769.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 6000 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 7632 0.0 0.0 0.0
2014 8135 0.0 0.0 0.0
2015 8639 0.0 0.0 0.0
2016 8567 0.0 0.0 0.0
2017 8640 0.0 0.0 0.0
2018 8375 0.0 0.0 0.0
2019 8639 0.0 0.0 0.0
2020 2040 0.0 0.0 0.0

For data sources see[6]

References