X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605200207000

Well Details

Well ID: 0605200207000
Loading map...
Location: 00/07-02-060-20W5/0
Location Alias: 00/07-02-60-20 W5M
Location Alias 2: 00/07-02-060-20 W5/00
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 20
Section: 02
County/Municipality: Municipal District of Greenview No. 16
Well Name: TRILOGY HZ KAYBOBS 7-2-60-20
Operator Name: Paramount Resources Ltd.
License Number: 0408065
License Date: 2009-01-16
License Status: Amended
Spud Date: 2009-02-08
Final Drill Date: 2009-03-04
Well Total Depth: 3490.00 m
Surface Hole Latitude: 54.164783
Surface Hole Longitude: -116.870968

For data sources see[1][2]

Well History

Date Event
2009-01-16 Obtained License
2009-02-09 Lost Circulation Occurred
2009-02-12 Surface Casing Operation Performed
2009-02-13 Direction Drilling Operation Performed - Horizontal
2009-02-25 Intermediate Casing Operation Performed
2009-03-03 Liner Casing Operation Performed
2009-03-04 Finished Drilling
2009-03-04 Well Log Performed
2009-03-04 Well Mode changed to Drilled and Cased
2009-03-06 Well Log Performed
2009-03-08 Rig Released
2009-03-13 Perforation Treatment Performed - Multi-Stage Fracture
2009-03-13 Perforation Treatment Performed - Open-Hole Completion
2009-04-04 Well Began Production
2009-04-04 Well Fluid changed to Gas
2009-04-04 Well Mode changed to Flowing
2014-05-19 Well Fluid changed to Gas
2014-05-19 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2009-02-13 1219.80 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-03-13 Open Hole/Barefoot Completion 3468.00 3490.00 0
2009-03-13 Multi-Stage Fracture 3459.80 3459.90 0
2009-03-13 Multi-Stage Fracture 3378.20 3378.30 0
2009-03-13 Multi-Stage Fracture 3231.80 3231.90 0
2009-03-13 Multi-Stage Fracture 3105.00 3105.10 0
2009-03-13 Multi-Stage Fracture 2978.40 2978.50 0
2009-03-13 Multi-Stage Fracture 2834.40 2834.50 0
2009-03-13 Multi-Stage Fracture 2665.20 2665.30 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 6264 0.0 0.0 0.0
2010 6392 0.0 0.0 0.0
2011 600 0.0 0.0 0.0
2012 5376 0.0 0.0 0.0
2013 6504 0.0 0.0 0.0
2014 6888 0.0 0.0 0.0
2015 24 0.0 0.0 0.0
2016 3576 0.0 0.0 0.0
2017 6096 0.0 0.0 0.0
2018 8447 0.0 0.0 0.0
2019 7535 0.0 0.0 0.0
2020 1440 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2009-02-09 Lost Circulation 134.00 134.00
2009-03-23 No Incident Encountered 0.00 0.00

For data sources see[7]

References