X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605192507002

Well Details

Well ID: 0605192507002
Loading map...
Location: 00/07-25-060-19W5/2
Location Alias: 00/07-25-60-19 W5M
Location Alias 2: 00/07-25-060-19 W5/02
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 19
Section: 25
County/Municipality: Municipal District of Greenview No. 16
Well Name: CEQUENCE KAYBOBS 7-25-60-19
Operator Name: Cequence Energy Ltd.
License Number: 0039651
License Date: 1971-02-01
License Status: Issued
Spud Date: 1971-02-09
Final Drill Date: 1971-03-13
Well Total Depth: 3371.10 m
Surface Hole Latitude: 54.217067
Surface Hole Longitude: -116.710701

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1971-02-01 Obtained License
1971-02-22 Drill Stem Test Performed
1971-03-13 Finished Drilling
1971-03-15 Production Casing Operation Performed
1971-12-11 Perforation Treatment Performed - Jet Perforation
1971-12-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-03-06 Well Log Performed
1990-12-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-12-15 Plug Back Performed
1990-12-16 Well Log Performed
1990-12-19 Perforation Treatment Performed - Jet Perforation
1990-12-19 Well Log Performed
1990-12-20 Perforation Treatment Performed - Fractured
1991-01-19 Well Mode changed to Drilled and Cased
1991-04-01 Well Began Production
1991-04-01 Well Fluid changed to Gas
1991-04-01 Well Mode changed to Flowing
2001-03-01 Well Fluid changed to Gas
2001-03-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1971-12-11 Perforation 3329.00 3333.30 7
1971-12-13 Acid Treatment 3329.00 3333.30 0
1971-12-13 Acid Treatment 3329.00 3333.30 0
1990-12-15 Packing Device Capped w/Cement 3280.00 3296.00 0
1990-12-15 Packing Device Capped w/Cement 2200.00 2208.00 0
1990-12-19 Perforation 2153.70 2162.30 16
1990-12-20 Fracture 2153.70 2162.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1991 2714 0.0 0.0 0.0
1992 6097 0.0 0.0 0.0
1993 7227 0.0 0.0 0.0
1994 5475 0.0 0.0 0.0
1995 6756 0.0 0.0 0.0
1996 7122 0.0 0.0 0.0
1997 6591 0.0 0.0 0.0
1998 7150 0.0 0.0 0.0
1999 7880 0.0 0.0 0.0
2000 7895 0.0 0.0 0.0
2001 8311 0.0 0.0 0.0
2002 5318 0.0 0.0 0.0
2003 8563 0.0 0.0 0.0
2004 8458 0.0 0.0 0.0
2005 8711 0.0 0.0 0.0
2006 8711 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8735 0.0 0.0 0.0
2009 8687 0.0 0.0 0.0
2010 8485 0.0 0.0 0.0
2011 8629 0.0 0.0 0.0
2012 8202 0.0 0.0 0.0
2013 8375 0.0 0.0 0.0
2014 8147 0.0 0.0 0.0
2015 6269 0.0 0.0 0.0
2016 4548 0.0 0.0 0.0
2017 4469 0.0 0.0 0.0
2018 8095 0.0 0.0 0.0
2019 8520 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References