X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605182102020

Well Details

Well ID: 0605182102020
Loading map...
Location: 02/02-21-060-18W5/0
Location Alias: 02/02-21-60-18 W5M
Location Alias 2: 02/02-21-060-18 W5/00
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 18
Section: 21
County/Municipality: Municipal District of Greenview No. 16
Well Name: CELTIC 102 HZ KAYBOBS 2-21-60-18
Operator Name: XTO Energy Canada ULC
License Number: 0400020
License Date: 2008-08-22
License Status: Suspension
Spud Date: 2008-08-28
Final Drill Date: 2008-09-19
Well Total Depth: 3908.00 m
Surface Hole Latitude: 54.212985
Surface Hole Longitude: -116.638167

For data sources see[1][2]

Well History

Date Event
2008-08-22 Obtained License
2008-08-29 Surface Casing Operation Performed
2008-09-01 Direction Drilling Operation Performed - Horizontal
2008-09-08 Production Casing Operation Performed
2008-09-19 Finished Drilling
2008-09-19 Well Log Performed
2008-09-19 Well Mode changed to Drilled and Cased
2008-09-25 Liner Casing Operation Performed
2008-09-25 Perforation Treatment Performed - Open-Hole Completion
2008-09-26 Rig Released
2008-10-05 Well Log Performed
2008-10-07 Perforation Treatment Performed - Multi-Stage Fracture
2008-10-07 Well Began Production
2008-10-07 Well Fluid changed to Gas
2008-10-07 Well Mode changed to Flowing
2009-07-25 Well Log Performed
2010-06-24 Well Fluid changed to Gas
2010-06-24 Well Mode changed to Pumping
2018-12-01 Well Fluid changed to Gas
2018-12-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2008-09-01 1782.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2008-09-25 Open Hole/Barefoot Completion 3883.30 3908.00 0
2008-10-07 Multi-Stage Fracture 3873.90 3875.20 0
2008-10-07 Multi-Stage Fracture 3776.90 3777.60 0
2008-10-07 Multi-Stage Fracture 3524.00 3524.70 0
2008-10-07 Multi-Stage Fracture 3269.30 3270.00 0
2008-10-07 Multi-Stage Fracture 2910.90 2911.60 0
2008-10-07 Multi-Stage Fracture 2685.20 2685.90 0
2008-10-07 Multi-Stage Fracture 2507.20 2507.90 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 1838 0.0 0.0 0.0
2009 5542 0.0 0.0 0.0
2010 5597 0.0 0.0 0.0
2011 7672 0.0 0.0 0.0
2012 4728 0.0 0.0 0.0
2013 7037 0.0 0.0 0.0
2014 6741 0.0 0.0 0.0
2015 4524 0.0 0.0 0.0
2016 732 0.0 0.0 0.0
2017 5378 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2008-10-07 No Incident Encountered 0.00 0.00

For data sources see[7]

References