X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605181705000

Well Details

Well ID: 0605181705000
Loading map...
Location: 00/05-17-060-18W5/0
Location Alias: 00/05-17-60-18 W5M
Location Alias 2: 00/05-17-060-18 W5/00
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 18
Section: 17
County/Municipality: Municipal District of Greenview No. 16
Well Name: BP KAYBOBS 5-17-60-18
Operator Name: TAQA North Ltd.
License Number: 0054621
License Date: 1975-08-18
License Status: Suspension
Spud Date: 1975-08-29
Final Drill Date: 1975-10-02
Well Total Depth: 3288.80 m
Surface Hole Latitude: 54.188692
Surface Hole Longitude: -116.673633

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-08-18 Obtained License
1975-10-02 Finished Drilling
1975-10-02 Well Mode changed to Drilled and Cased
1975-10-04 Production Casing Operation Performed
1975-12-16 Perforation Treatment Performed - Jet Perforation
1975-12-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-12-29 Well Began Production
1975-12-29 Well Fluid changed to Gas
1975-12-29 Well Mode changed to Flowing
1976-02-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-09-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-09-09 Perforation Treatment Performed - Cement Plug
1985-09-09 Well Log Performed
1985-11-15 Well Log Performed
1987-03-22 Well Log Performed
1987-04-15 Perforation Treatment Performed - Jet Perforation
1987-04-15 Well Log Performed
1988-07-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-10-18 Well Log Performed
1996-07-06 Well Log Performed
1996-07-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-07-12 Plug Back Performed
1996-07-12 Well Fluid changed to Gas
1996-07-12 Well Mode changed to Abandoned Zone
1996-07-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-07-14 Perforation Treatment Performed - Jet Perforation
1996-07-14 Well Log Performed
1996-07-15 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-12-16 Perforation 3217.20 3223.60 7
1996-07-14 Perforation 2050.00 2055.00 17
1996-07-14 Perforation 2067.80 2082.40 17
1996-07-15 Fracture 2050.00 2082.40 0
1975-12-29 Acid Treatment 3217.20 3223.60 0
1976-02-02 Acid Treatment 3217.20 3223.60 0
1985-09-08 Acid Treatment 3217.20 3223.60 0
1985-09-09 Cement Plug 3218.00 3219.80 0
1987-04-15 Perforation 3206.00 3211.00 13
1988-07-14 Acid Treatment 3206.00 3218.00 0
1996-07-12 Packing Device Capped w/Cement 2669.70 3173.30 0
1996-07-14 Packing Device Capped w/Cement 2116.90 2123.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1975 64 0.0 0.0 0.0
1976 8283 0.0 0.0 0.0
1977 7569 0.0 0.0 0.0
1978 7695 0.0 0.0 0.0
1979 8456 0.0 0.0 0.0
1980 8740 0.0 0.0 0.0
1981 8258 0.0 0.0 0.0
1982 4098 0.0 0.0 0.0
1984 1 0.0 0.0 0.0
1986 3122 0.0 0.0 0.0
1987 6683 0.0 0.0 0.0
1988 4138 0.0 0.0 0.0
1989 4334 0.0 0.0 0.0
1990 2741 0.0 0.0 0.0
1991 4705 0.0 0.0 0.0
1992 1014 0.0 0.0 0.0
1993 3114 0.0 0.0 0.0
1994 89 0.0 0.0 0.0

For data sources see[5]

References