X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605181516020

Well Details

Well ID: 0605181516020
Loading map...
Location: 02/16-15-060-18W5/0
Location Alias: 02/16-15-60-18 W5M
Location Alias 2: 02/16-15-060-18 W5/00
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 18
Section: 15
County/Municipality: Municipal District of Greenview No. 16
Well Name: CELTIC HZ KAYBOBS 16-15-60-18
Operator Name: XTO Energy Canada ULC
License Number: 0401500
License Date: 2008-09-26
License Status: Issued
Spud Date: 2008-10-04
Final Drill Date: 2008-10-22
Well Total Depth: 3774.00 m
Surface Hole Latitude: 54.190472
Surface Hole Longitude: -116.632834

For data sources see[1][2]

Well History

Date Event
2008-09-26 Obtained License
2008-10-04 Well Log Performed
2008-10-05 Surface Casing Operation Performed
2008-10-08 Direction Drilling Operation Performed - Horizontal
2008-10-12 Production Casing Operation Performed
2008-10-22 Finished Drilling
2008-10-22 Well Log Performed
2008-10-22 Well Mode changed to Drilled and Cased
2008-10-23 Well Log Performed
2008-10-24 Liner Casing Operation Performed
2008-10-24 Perforation Treatment Performed - Open-Hole Completion
2008-10-25 Rig Released
2008-10-29 Well Began Production
2008-10-29 Well Fluid changed to Gas
2008-10-29 Well Log Performed
2008-10-29 Well Mode changed to Flowing
2008-11-04 Perforation Treatment Performed - Multi-Stage Fracture
2010-11-03 Well Fluid changed to Gas
2010-11-03 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2008-10-08 1657.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2008-10-24 Open Hole/Barefoot Completion 3753.60 3774.00 0
2008-11-04 Multi-Stage Fracture 3744.10 3745.30 0
2008-11-04 Multi-Stage Fracture 3582.00 3582.70 0
2008-11-04 Multi-Stage Fracture 3358.10 3358.80 0
2008-11-04 Multi-Stage Fracture 3190.70 3191.40 0
2008-11-04 Multi-Stage Fracture 2937.60 2938.30 0
2008-11-04 Multi-Stage Fracture 2770.20 2770.80 0
2008-11-04 Multi-Stage Fracture 2518.50 2519.20 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 1155 0.0 0.0 0.0
2009 6870 0.0 0.0 0.0
2010 7008 0.0 0.0 0.0
2011 8417 0.0 0.0 0.0
2012 7734 0.0 0.0 0.0
2013 7356 0.0 0.0 0.0
2014 4910 0.0 0.0 0.0
2015 7831 0.0 0.0 0.0
2016 4515 0.0 0.0 0.0
2017 7034 0.0 0.0 0.0
2018 5802 0.0 0.0 0.0
2019 1 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2008-11-04 No Incident Encountered 0.00 0.00

For data sources see[7]

References