X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605181306000

Well Details

Well ID: 0605181306000
Loading map...
Location: 00/06-13-060-18W5/0
Location Alias: 00/06-13-60-18 W5M
Location Alias 2: 00/06-13-060-18 W5/00
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 18
Section: 13
County/Municipality: Municipal District of Greenview No. 16
Well Name: CNRL ET AL KAYBOBS 6-13-60-18
Operator Name: Canadian Natural Resources Limited
License Number: 0061750
License Date: 1976-12-22
License Status: Suspension
Spud Date: 1977-01-15
Final Drill Date: 1977-02-28
Well Total Depth: 3196.40 m
Surface Hole Latitude: 54.187280
Surface Hole Longitude: -116.568628

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-12-22 Obtained License
1977-01-15 Lost Circulation Occurred
1977-01-25 Drill Stem Test Performed
1977-02-05 Lost Circulation Occurred
1977-02-28 Finished Drilling
1977-03-03 Drill Stem Test Performed
1977-03-04 Drill Stem Test Performed
1977-03-05 Drill Stem Test Performed
1977-03-06 Drill Stem Test Performed
1977-03-09 Production Casing Operation Performed
1977-03-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-03-18 Perforation Treatment Performed - Jet Perforation
1977-03-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-03-21 Perforation Treatment Performed - Cement Squeeze
1977-03-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-03-22 Perforation Treatment Performed - Jet Perforation
1977-03-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-03-27 Well Log Performed
1977-03-31 Perforation Treatment Performed - Cement Squeeze
1977-04-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-04-02 Perforation Treatment Performed - Jet Perforation
1977-04-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-04-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-04-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1977-04-11 Perforation Treatment Performed - Jet Perforation
1977-04-15 Well Mode changed to Drilled and Cased
1980-11-18 Well Began Production
1980-11-18 Well Fluid changed to Gas
1980-11-18 Well Mode changed to Flowing
2003-09-07 Perforation Treatment Performed - Jet Perforation
2003-09-08 Perforation Treatment Performed - Fractured
2006-11-01 Well Fluid changed to Gas
2006-11-01 Well Mode changed to Suspended
2006-11-02 Well Fluid changed to Gas
2006-11-02 Well Mode changed to Flowing
2015-08-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-08-16 Perforation Treatment Performed - Jet Perforation
2015-08-16 Plug Back Performed
2015-08-16 Well Fluid changed to Gas
2015-08-16 Well Log Performed
2015-08-16 Well Mode changed to Abandoned Zone
2015-08-17 Perforation Treatment Performed - Cement Plug
2015-08-17 Perforation Treatment Performed - Remedial Casing
2015-08-18 Perforation Treatment Performed - Jet Perforation
2015-08-18 Well Log Performed
2015-08-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-08-19 Perforation Treatment Performed - Remedial Casing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-03-18 Perforation 3082.70 3085.80 13
1977-04-02 Acid Treatment 3077.90 3080.00 0
1977-04-06 Acid Treatment 3077.90 3080.00 0
1977-04-09 Acid Treatment 3077.90 3080.00 0
1977-04-10 Packing Device Capped w/Cement 3064.80 3072.40 0
1977-04-10 Packing Device Capped w/Cement 2011.70 2019.30 0
1977-04-11 Perforation 1975.10 1976.90 13
2003-09-07 Perforation 1976.50 1981.50 17
2003-09-07 Perforation 1983.50 1986.50 17
2003-09-08 Fracture 1975.00 1986.50 0
2015-08-16 Packing Device Capped w/Cement 1956.00 1965.00 0
1977-03-18 Acid Treatment 3082.70 3085.80 0
2015-08-16 Perforation 1334.00 1336.00 13
2015-08-17 Remedial Casing Cementing 1334.00 1336.00 0
2015-08-17 Cement Plug 1302.00 1355.00 0
2015-08-18 Perforation 1050.00 1051.00 13
2015-08-19 Remedial Casing Cementing 1050.00 1051.00 0
2015-08-19 Packing Device Capped w/Cement 1027.00 1044.00 0
1977-03-19 Acid Treatment 3082.70 3085.80 0
1977-03-21 Cement Squeeze 3082.70 3085.80 0
1977-03-22 Perforation 3077.90 3080.00 13
1977-03-22 Acid Treatment 3077.90 3080.00 0
1977-03-23 Acid Treatment 3077.90 3080.00 0
1977-03-31 Cement Squeeze 3077.90 3080.00 0
1977-04-02 Perforation 3077.90 3080.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1980 582 0.0 0.0 0.0
1981 6045 0.0 0.0 0.0
1982 6108 0.0 0.0 0.0
1983 4339 0.0 0.0 0.0
1984 3963 0.0 0.0 0.0
1985 3395 0.0 0.0 0.0
1986 2727 0.0 0.0 0.0
1987 4580 0.0 0.0 0.0
1988 5165 0.0 0.0 0.0
1989 5519 0.0 0.0 0.0
1990 4602 0.0 0.0 0.0
1991 4326 0.0 0.0 0.0
1992 5307 0.0 0.0 0.0
1993 6965 0.0 0.0 0.0
1994 6731 0.0 0.0 0.0
1995 7360 0.0 0.0 0.0
1996 8649 0.0 0.0 0.0
1997 8160 0.0 0.0 0.0
1998 8370 0.0 0.0 0.0
1999 6866 0.0 0.0 0.0
2000 5067 0.0 0.0 0.0
2001 4391 0.0 0.0 0.0
2002 7355 0.0 0.0 0.0
2003 8079 0.0 0.0 0.0
2004 4655 0.0 0.0 0.0
2006 3672 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8446 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8447 0.0 0.0 0.0
2013 8399 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 3585 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1977-01-15 Lost Circulation 33.20 55.50
1977-02-05 Lost Circulation 2155.00 2388.70
2015-08-20 No Incident Encountered 0.00 0.00

For data sources see[6]

References