X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605180907000

Well Details

Well ID: 0605180907000
Loading map...
Location: 00/07-09-060-18W5/0
Location Alias: 00/07-09-60-18 W5M
Location Alias 2: 00/07-09-060-18 W5/00
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 18
Section: 09
County/Municipality: Municipal District of Greenview No. 16
Well Name: BP KAYBOBS 7-9-60-18
Operator Name: XTO Energy Canada ULC
License Number: 0036216
License Date: 1969-05-20
License Status: Suspension
Spud Date: 1969-06-10
Final Drill Date: 1969-07-22
Well Total Depth: 3272.90 m
Surface Hole Latitude: 54.172547
Surface Hole Longitude: -116.633668

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1969-05-20 Obtained License
1969-07-22 Finished Drilling
1969-07-22 Well Mode changed to Drilled and Cased
1969-07-23 Production Casing Operation Performed
1970-01-30 Perforation Treatment Performed - Jet Perforation
1970-02-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-07-12 Well Began Injection
1970-07-12 Well Fluid changed to Gas
1970-07-12 Well Type changed to Injection
1988-01-14 Well Log Performed
1990-06-01 Well Began Production
1990-06-01 Well Fluid changed to Gas
1990-06-01 Well Type changed to Storage
1991-09-25 Well Log Performed
1991-10-26 Well Log Performed
1993-01-27 Well Log Performed
1993-05-30 Well Log Performed
2003-01-01 Well Fluid changed to Gas
2003-01-01 Well Mode changed to Suspended
2003-01-01 Well Type changed to Storage
2005-12-01 Well Fluid changed to Gas
2005-12-01 Well Mode changed to Flowing
2006-10-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-10-05 Plug Back Performed
2006-10-05 Well Fluid changed to Gas
2006-10-05 Well Mode changed to Abandoned Zone
2006-10-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-10-08 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1970-01-30 Perforation 3189.40 3199.80 7
1970-02-07 Acid Treatment 3189.40 3199.80 0
2006-10-05 Packing Device Capped w/Cement 2997.00 3005.00 0
2006-10-08 Packing Device Capped w/Cement 2478.00 2486.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1970 129 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 4423 0.0 0.0 0.0
1991 7996 0.0 0.0 0.0
1992 7392 0.0 0.0 0.0
1993 6819 0.0 0.0 0.0
1994 8106 0.0 0.0 0.0
1995 8004 0.0 0.0 0.0
1996 7439 0.0 0.0 0.0
1997 2427 0.0 0.0 0.0
1998 3452 0.0 0.0 0.0
1999 1322 0.0 0.0 0.0
2000 3689 0.0 0.0 0.0
2001 2928 0.0 0.0 0.0
2002 496 0.0 0.0 0.0
2005 744 0.0 0.0 0.0
2006 2160 0.0 0.0 0.0

For data sources see[5]

References