X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605180712002

Well Details

Well ID: 0605180712002
Loading map...
Location: 00/12-07-060-18W5/2
Location Alias: 00/12-07-60-18 W5M
Location Alias 2: 00/12-07-060-18 W5/02
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 18
Section: 07
County/Municipality: Municipal District of Greenview No. 16
Well Name: BP KAYBOBS 12-7-60-18
Operator Name: TAQA North Ltd.
License Number: 0036317
License Date: 1969-06-05
License Status: Suspension
Spud Date: 1969-06-15
Final Drill Date: 1969-07-21
Well Total Depth: 3256.80 m
Surface Hole Latitude: 54.174128
Surface Hole Longitude: -116.698184

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1969-06-05 Obtained License
1969-07-21 Finished Drilling
1969-07-21 Well Mode changed to Drilled and Cased
1969-07-23 Production Casing Operation Performed
1969-08-01 Perforation Treatment Performed - Jet Perforation
1969-08-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-10-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-01-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-01-31 Plug Back Performed
1993-02-02 Perforation Treatment Performed - Jet Perforation
1993-02-04 Perforation Treatment Performed - Cement Squeeze
1993-02-09 Perforation Treatment Performed - Cement Squeeze
1993-02-14 Perforation Treatment Performed - Jet Perforation
1993-02-14 Well Log Performed
1993-02-16 Perforation Treatment Performed - Fractured
1993-03-01 Well Began Production
1993-03-01 Well Fluid changed to Gas
1993-03-01 Well Mode changed to Flowing
2004-04-04 Well Fluid changed to Gas
2004-04-04 Well Mode changed to Pumping
2015-10-01 Well Fluid changed to Gas
2015-10-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1969-08-01 Perforation 3203.40 3208.90 7
1993-02-14 Perforation 2035.50 2046.50 13
1993-02-16 Fracture 2035.50 2046.50 0
1969-08-01 Perforation 3206.80 3212.30 7
1969-08-18 Acid Treatment 3203.40 3212.30 0
1969-10-04 Acid Treatment 3203.40 3212.30 0
1993-01-31 Packing Device Capped w/Cement 3157.00 3166.00 0
1993-02-02 Perforation 2023.00 2024.00 13
1993-02-02 Perforation 2074.00 2075.00 13
1993-02-04 Cement Squeeze 2074.00 2075.00 0
1993-02-09 Cement Squeeze 2023.00 2024.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 5286 0.0 0.0 0.0
1998 6476 0.0 0.0 0.0
1999 8435 0.0 0.0 0.0
2000 8715 0.0 0.0 0.0
2001 8759 0.0 0.0 0.0
2002 8354 0.0 0.0 0.0
2003 5387 0.0 0.0 0.0
2004 7356 0.0 0.0 0.0
2005 8591 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 7319 0.0 0.0 0.0
2008 8524 0.0 0.0 0.0
2009 7283 0.0 0.0 0.0
2010 8594 0.0 0.0 0.0
2011 8599 0.0 0.0 0.0
2012 5952 0.0 0.0 0.0
2013 5543 0.0 0.0 0.0
2014 3623 0.0 0.0 0.0

For data sources see[5]

References