X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605180507002

Well Details

Well ID: 0605180507002
Loading map...
Location: 00/07-05-060-18W5/2
Location Alias: 00/07-05-60-18 W5M
Location Alias 2: 00/07-05-060-18 W5/02
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 18
Section: 05
County/Municipality: Municipal District of Greenview No. 16
Well Name: BP KAYBOBS 7-5-60-18
Operator Name: XTO Energy Canada ULC
License Number: 0034117
License Date: 1968-05-16
License Status: Suspension
Spud Date: 1968-07-05
Final Drill Date: 1993-05-18
Well Total Depth: 3197.00 m
Surface Hole Latitude: 54.157888
Surface Hole Longitude: -116.663795

For data sources see[1][2]

Well History

Date Event
1968-05-16 Obtained License
1968-09-01 Production Casing Operation Performed
1993-05-08 Direction Drilling Operation Performed - Sidetrack Fish
1993-05-18 Finished Drilling
1993-05-18 Well Log Performed
1993-05-18 Well Mode changed to Drilled and Cased
1993-05-21 Well Log Performed
1993-05-27 Liner Casing Operation Performed
1993-05-29 Rig Released
1993-06-06 Perforation Treatment Performed - Open-Hole Completion
1993-06-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-07-01 Well Began Production
1993-07-01 Well Fluid changed to Gas
1993-07-01 Well Mode changed to Flowing
2002-10-01 Well Fluid changed to Gas
2002-10-01 Well Mode changed to Pumping
2011-09-01 Well Fluid changed to Gas
2011-09-01 Well Mode changed to Suspended
2012-08-01 Well Log Performed
2012-08-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-08-06 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1993-05-08 2717.00 Sidetrack fish

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-06-06 Open Hole/Barefoot Completion 3183.00 3197.00 0
1993-06-12 Acid Treatment 3183.00 3197.00 0
2012-08-06 Packing Device Capped w/Cement 3154.80 3161.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 3131 0.0 0.0 0.0
1994 8564 0.0 0.0 0.0
1995 8059 0.0 0.0 0.0
1996 7831 0.0 0.0 0.0
1997 8207 0.0 0.0 0.0
1998 8577 0.0 0.0 0.0
1999 8646 0.0 0.0 0.0
2000 8640 0.0 0.0 0.0
2001 8759 0.0 0.0 0.0
2002 8694 0.0 0.0 0.0
2003 8697 0.0 0.0 0.0
2004 8783 0.0 0.0 0.0
2005 7655 0.0 0.0 0.0
2006 7295 0.0 0.0 0.0
2007 52 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-08-06 No Incident Encountered 0.00 0.00

For data sources see[7]

References