X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605180403000

Well Details

Well ID: 0605180403000
Loading map...
Location: 00/03-04-060-18W5/0
Location Alias: 00/03-04-60-18 W5M
Location Alias 2: 00/03-04-060-18 W5/00
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 18
Section: 04
County/Municipality: Municipal District of Greenview No. 16
Well Name: TRILOGY BHLU 3 KAYBOBS 3-4-60-18
Operator Name: Paramount Resources Ltd.
License Number: 0157050
License Date: 1993-03-05
License Status: Suspension
Spud Date: 1993-03-13
Final Drill Date: 1993-04-03
Well Total Depth: 3230.00 m
Surface Hole Latitude: 54.155265
Surface Hole Longitude: -116.638967

For data sources see[1][2]

Well History

Date Event
1993-03-05 Obtained License
1993-03-15 Surface Casing Operation Performed
1993-04-03 Finished Drilling
1993-04-03 Well Mode changed to Drilled and Cased
1993-04-04 Well Log Performed
1993-04-06 Lost Circulation Occurred
1993-04-10 Perforation Treatment Performed - Jet Perforation
1993-04-10 Perforation Treatment Performed - Remedial Casing
1993-04-15 Perforation Treatment Performed - Jet Perforation
1993-04-15 Perforation Treatment Performed - Remedial Casing
1993-04-15 Production Casing Operation Performed
1993-04-17 Rig Released
1993-04-27 Well Log Performed
1993-05-03 Perforation Treatment Performed - Jet Perforation
1993-05-03 Well Log Performed
1993-05-04 Perforation Treatment Performed - Jet Perforation
1993-05-05 Perforation Treatment Performed - Remedial Casing
1993-05-06 Perforation Treatment Performed - Jet Perforation
1993-05-06 Well Log Performed
1993-05-12 Perforation Treatment Performed - Remedial Casing
1993-05-14 Perforation Treatment Performed - Remedial Casing
1993-05-17 Well Log Performed
1993-05-18 Perforation Treatment Performed - Jet Perforation
1993-05-18 Well Log Performed
1993-05-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-05-21 Perforation Treatment Performed - Remedial Casing
1993-05-24 Perforation Treatment Performed - Jet Perforation
1993-05-24 Well Log Performed
1993-05-26 Well Log Performed
1993-05-27 Perforation Treatment Performed - Remedial Casing
1993-05-29 Perforation Treatment Performed - Remedial Casing
1993-06-03 Well Log Performed
1993-06-04 Perforation Treatment Performed - Jet Perforation
1993-06-04 Well Log Performed
1993-06-07 Well Log Performed
1993-06-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-06-09 Well Log Performed
1993-06-15 Well Began Production
1993-06-15 Well Fluid changed to Gas
1993-06-15 Well Mode changed to Flowing
1998-03-17 Well Log Performed
2006-12-11 Well Log Performed
2006-12-16 Well Log Performed
2006-12-21 Well Log Performed
2007-11-15 Well Fluid changed to Gas
2007-11-15 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-04-10 Perforation 2975.00 2975.60 13
1993-05-12 Remedial Casing Cementing 3166.00 3167.00 0
1993-05-14 Remedial Casing Cementing 3123.00 3124.00 0
1993-05-18 Perforation 3140.50 3141.50 72
1993-05-18 Perforation 3155.50 3156.50 72
1993-05-19 Acid Treatment 3140.50 3156.50 0
1993-05-21 Remedial Casing Cementing 3140.50 3156.50 0
1993-05-24 Perforation 3140.00 3142.00 18
1993-05-24 Perforation 3155.00 3157.00 18
1993-05-27 Remedial Casing Cementing 3155.00 3157.00 0
1993-05-29 Remedial Casing Cementing 3140.00 3142.00 0
1993-04-10 Perforation 3222.00 3222.60 13
1993-06-04 Perforation 3124.50 3126.50 17
1993-06-04 Perforation 3131.00 3132.50 17
1993-06-04 Perforation 3135.50 3137.50 17
1993-06-04 Perforation 3144.00 3146.00 17
1993-06-04 Perforation 3147.50 3149.50 17
1993-06-09 Acid Treatment 3124.50 3149.50 0
1993-04-10 Remedial Casing Cementing 2975.00 3222.60 0
1993-04-15 Perforation 2499.20 2500.00 13
1993-04-15 Remedial Casing Cementing 2499.20 2500.00 0
1993-05-03 Perforation 3166.00 3167.00 72
1993-05-04 Perforation 3103.00 3104.00 72
1993-05-05 Remedial Casing Cementing 3103.00 3104.00 0
1993-05-06 Perforation 3123.00 3124.00 72

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 4763 0.0 0.0 0.0
1994 8408 0.0 0.0 0.0
1995 8694 0.0 0.0 0.0
1996 8765 0.0 0.0 0.0
1997 8338 0.0 0.0 0.0
1998 8469 0.0 0.0 0.0
1999 4652 0.0 0.0 0.0
2000 1330 0.0 0.0 0.0
2001 7220 0.0 0.0 0.0
2002 7669 0.0 0.0 0.0
2003 5765 0.0 0.0 0.0
2004 7333 0.0 0.0 0.0
2005 20 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1993-04-06 Lost Circulation 3230.00 3230.00

For data sources see[6]

References