X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605171901000

Well Details

Well ID: 0605171901000
Loading map...
Location: 00/01-19-060-17W5/0
Location Alias: 00/01-19-60-17 W5M
Location Alias 2: 00/01-19-060-17 W5/00
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 17
Section: 19
County/Municipality: Municipal District of Greenview No. 16
Well Name: TRIOIL HZ KAYBOBS 1-19-60-17
Operator Name: ORLEN Upstream Canada Ltd.
License Number: 0444740
License Date: 2012-03-07
License Status: Issued
Spud Date: 2012-03-22
Final Drill Date: 2012-03-30
Well Total Depth: 3044.00 m
Surface Hole Latitude: 54.197026
Surface Hole Longitude: -116.552485

For data sources see[1][2]

Well History

Date Event
2012-03-07 Obtained License
2012-03-23 Surface Casing Operation Performed
2012-03-24 Well Log Performed
2012-03-25 Direction Drilling Operation Performed - Horizontal
2012-03-27 Well Log Performed
2012-03-30 Finished Drilling
2012-03-30 Well Log Performed
2012-03-30 Well Mode changed to Drilled and Cased
2012-04-01 Liner Casing Operation Performed
2012-04-01 Production Casing Operation Performed
2012-04-02 Rig Released
2012-04-12 Well Log Performed
2012-04-17 Perforation Treatment Performed - Multi-Stage Fracture
2012-04-17 Perforation Treatment Performed - Open-Hole Completion
2012-04-17 Well Began Production
2012-04-17 Well Fluid changed to Crude Oil
2012-04-17 Well Mode changed to Flowing
2012-04-18 Perforation Treatment Performed - Multi-Stage Fracture

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-03-22 Trinidad Drilling Ltd. 94 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-03-25 1255.70 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-04-17 Open Hole/Barefoot Completion 3023.20 3044.00 0
2012-04-17 Multi-Stage Fracture 2496.50 2496.60 0
2012-04-17 Multi-Stage Fracture 2434.10 2434.20 0
2012-04-17 Multi-Stage Fracture 2372.00 2372.10 0
2012-04-17 Multi-Stage Fracture 2309.90 2310.00 0
2012-04-17 Multi-Stage Fracture 2247.30 2247.40 0
2012-04-17 Multi-Stage Fracture 2173.80 2173.90 0
2012-04-17 Multi-Stage Fracture 2110.80 2110.90 0
2012-04-17 Multi-Stage Fracture 2048.50 2048.60 0
2012-04-17 Multi-Stage Fracture 2933.00 2933.10 0
2012-04-18 Multi-Stage Fracture 1924.40 1924.50 0
2012-04-17 Multi-Stage Fracture 3018.60 3018.70 0
2012-04-18 Multi-Stage Fracture 1850.90 1851.00 0
2012-04-18 Multi-Stage Fracture 1789.30 1789.40 0
2012-04-17 Multi-Stage Fracture 2955.70 2955.80 0
2012-04-17 Multi-Stage Fracture 2893.30 2893.40 0
2012-04-17 Multi-Stage Fracture 2819.20 2819.30 0
2012-04-17 Multi-Stage Fracture 2757.00 2757.10 0
2012-04-17 Multi-Stage Fracture 2694.90 2695.00 0
2012-04-17 Multi-Stage Fracture 2632.70 2632.80 0
2012-04-17 Multi-Stage Fracture 2570.40 2570.50 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 5298 0.0 0.0 0.0
2013 8622 0.0 0.0 0.0
2014 7832 0.0 0.0 0.0
2015 8144 0.0 0.0 0.0
2016 8281 0.0 0.0 0.0
2017 7753 0.0 0.0 0.0
2018 6749 0.0 0.0 0.0
2019 7025 0.0 0.0 0.0
2020 2072 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-04-02 No Incident Encountered 0.00 0.00
2012-04-24 No Incident Encountered 0.00 0.00

For data sources see[8]

References