X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605171703002

Well Details

Well ID: 0605171703002
Loading map...
Location: 00/03-17-060-17W5/2
Location Alias: 00/03-17-60-17 W5M
Location Alias 2: 00/03-17-060-17 W5/02
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 17
Section: 17
County/Municipality: Municipal District of Greenview No. 16
Well Name: TANGLE CREEK CHICKDEE 3-17-60-17
Operator Name: Tangle Creek Energy Ltd.
License Number: 0186508
License Date: 1996-03-04
License Status: Issued
Spud Date: 1996-03-14
Final Drill Date: 1996-03-24
Well Total Depth: 1957.50 m
Surface Hole Latitude: 54.185085
Surface Hole Longitude: -116.514867

For data sources see[1][2]

Well History

Date Event
1996-03-04 Obtained License
1996-03-15 Surface Casing Operation Performed
1996-03-24 Finished Drilling
1996-03-24 Well Mode changed to Drilled and Cased
1996-03-25 Well Log Performed
1996-03-26 Production Casing Operation Performed
1996-03-27 Rig Released
1996-03-28 Perforation Treatment Performed - Fractured
1996-03-28 Perforation Treatment Performed - Jet Perforation
1996-03-31 Perforation Treatment Performed - Fractured
1996-04-08 Perforation Treatment Performed - Jet Perforation
2008-07-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-07-05 Plug Back Performed
2008-07-07 Perforation Treatment Performed - Jet Perforation
2008-07-08 Perforation Treatment Performed - Fractured
2008-12-13 Well Began Production
2008-12-13 Well Fluid changed to Crude Oil
2008-12-13 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-03-28 Perforation 1916.00 1919.00 17
1996-03-28 Fracture 1916.00 1919.00 0
1996-03-31 Fracture 1916.00 1919.00 0
1996-04-08 Perforation 1907.00 1912.00 20
1996-04-08 Perforation 1921.00 1926.00 20
2008-07-05 Packing Device Capped w/Cement 1889.00 1897.00 0
2008-07-07 Perforation 1526.00 1538.00 13
2008-07-08 Fracture 1526.00 1538.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 432 0.0 0.0 0.0
2009 5496 0.0 0.0 0.0
2010 6124 0.0 0.0 0.0
2011 8339 0.0 0.0 0.0
2012 8400 0.0 0.0 0.0
2013 8038 0.0 0.0 0.0
2014 7855 0.0 0.0 0.0
2015 4844 0.0 0.0 0.0
2016 2586 0.0 0.0 0.0
2017 3996 0.0 0.0 0.0
2018 4778 0.0 0.0 0.0
2019 5736 0.0 0.0 0.0

For data sources see[5]

References