X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605153306000

Well Details

Well ID: 0605153306000
Loading map...
Location: 00/06-33-060-15W5/0
Location Alias: 00/06-33-60-15 W5M
Location Alias 2: 00/06-33-060-15 W5/00
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 15
Section: 33
County/Municipality: Woodlands County
Well Name: DAYLIGHT WIND 11-33-60-15
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0042733
License Date: 1972-06-09
License Status: Suspension
Spud Date: 1972-06-17
Final Drill Date: 1972-08-02
Well Total Depth: 3055.90 m
Surface Hole Latitude: 54.229951
Surface Hole Longitude: -116.192187

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1972-06-09 Obtained License
1972-07-12 Perforation Treatment Performed - Jet Perforation
1972-07-13 Perforation Treatment Performed - Acid Wash - No Pressure
1972-07-16 Drill Stem Test Performed
1972-07-23 Drill Stem Test Performed
1972-07-26 Drill Stem Test Performed
1972-08-02 Finished Drilling
1972-08-02 Well Mode changed to Drilled and Cased
1972-08-05 Production Casing Operation Performed
1972-08-17 Well Began Production
1972-08-17 Well Fluid changed to Crude Oil
1972-08-17 Well Mode changed to Flowing
1972-10-22 Perforation Treatment Performed - Jet Perforation
1972-10-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-10-24 Perforation Treatment Performed - Cement Squeeze
1972-10-26 Perforation Treatment Performed - Jet Perforation
1972-10-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-11-12 Perforation Treatment Performed - Cement Squeeze
1972-11-14 Perforation Treatment Performed - Jet Perforation
1972-11-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1972-11-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1973-09-15 Well Fluid changed to Crude Oil
1973-09-15 Well Mode changed to Suspended
1977-01-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-01-23 Well Began Injection
1978-01-23 Well Fluid changed to Gas
1978-01-23 Well Type changed to Injection
1990-06-27 Well Fluid changed to Gas
1990-06-27 Well Type changed to Storage
1993-03-01 Well Fluid changed to Gas
1993-03-01 Well Mode changed to Suspended
1993-03-01 Well Type changed to Storage
1999-12-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-12-21 Plug Back Performed
1999-12-21 Well Fluid changed to Gas
1999-12-21 Well Mode changed to Abandoned and Re-entered
1999-12-21 Well Type changed to Storage

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1972-07-12 Perforation 2609.10 2612.70 7
1972-11-14 Perforation 2610.90 2614.00 7
1972-11-16 Acid Treatment 2610.90 2614.00 0
1972-11-17 Acid Treatment 2610.90 2614.00 0
1977-01-22 Acid Treatment 2610.90 2614.00 0
1999-12-21 Packing Device Capped w/Cement 2551.00 2559.00 0
1972-07-13 Acid Wash 2609.10 2612.70 0
1972-10-22 Perforation 2627.10 2627.70 13
1972-10-23 Acid Treatment 2609.10 2627.70 0
1972-10-24 Cement Squeeze 2609.10 2627.70 0
1972-10-24 Cement Squeeze 2609.10 2627.70 0
1972-10-26 Perforation 2621.30 2622.80 7
1972-10-29 Acid Treatment 2621.30 2622.80 0
1972-11-12 Cement Squeeze 2621.30 2622.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1972 422 0.0 0.0 0.0
1977 31 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1990 46 0.0 0.0 0.0

For data sources see[5]

References