X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605140710002

Well Details

Well ID: 0605140710002
Loading map...
Location: 00/10-07-060-14W5/2
Location Alias: 00/10-07-60-14 W5M
Location Alias 2: 00/10-07-060-14 W5/02
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 14
Section: 07
County/Municipality: Woodlands County
Well Name: ACL WIND 10-7-60-14
Operator Name: Paramount Resources Ltd.
License Number: 0061183
License Date: 1976-11-17
License Status: Abandoned
Spud Date: 1976-11-29
Final Drill Date: 1976-12-28
Well Total Depth: 2712.70 m
Surface Hole Latitude: 54.177201
Surface Hole Longitude: -116.087443

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-11-17 Obtained License
1976-12-10 Drill Stem Test Performed
1976-12-24 Drill Stem Test Performed
1976-12-27 Drill Stem Test Performed
1976-12-28 Finished Drilling
1976-12-28 Well Log Performed
1976-12-28 Well Mode changed to Drilled and Cased
1976-12-31 Drill Stem Test Performed
1977-01-02 Production Casing Operation Performed
1977-01-21 Perforation Treatment Performed - Jet Perforation
1977-01-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-01-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-01-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-02-02 Perforation Treatment Performed - Jet Perforation
1977-02-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-03-20 Perforation Treatment Performed - Jet Perforation
1977-03-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-03-25 Well Began Production
1977-03-25 Well Fluid changed to Gas
1977-03-25 Well Mode changed to Flowing
1996-08-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-08-22 Plug Back Performed
1996-08-22 Well Log Performed
1996-08-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-08-23 Plug Back Performed
1996-08-27 Perforation Treatment Performed - Cement Plug
1996-08-27 Plug Back Performed
1996-08-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-08-28 Perforation Treatment Performed - Jet Perforation
1996-08-28 Perforation Treatment Performed - Remedial Casing
1996-08-28 Well Log Performed
1996-08-29 Well Log Performed
1996-08-31 Well Abandoned
1996-08-31 Well Fluid changed to Gas
1996-08-31 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-01-21 Perforation 2645.10 2647.50 7
1977-03-24 Acid Treatment 1836.10 1837.60 0
1996-08-22 Packing Device Capped w/Cement 2625.00 2633.00 0
1996-08-23 Packing Device Capped w/Cement 1822.00 1830.00 0
1996-08-27 Cement Plug 745.00 1200.00 0
1996-08-28 Perforation 415.00 416.00 13
1996-08-28 Remedial Casing Cementing 415.00 416.00 0
1996-08-28 Packing Device Capped w/Cement 398.00 405.10 0
1977-01-22 Acid Treatment 2645.10 2647.50 0
1977-01-24 Acid Treatment 2645.10 2647.50 0
1977-01-27 Acid Treatment 2645.10 2647.50 0
1977-02-02 Perforation 2653.90 2654.50 13
1977-02-02 Perforation 2654.80 2655.40 13
1977-02-03 Acid Treatment 2653.90 2655.40 0
1977-02-03 Acid Treatment 2645.10 2655.40 0
1977-03-20 Perforation 1836.10 1837.60 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1977 4405 0.0 0.0 0.0
1978 1886 0.0 0.0 0.0
1979 4709 0.0 0.0 0.0
1980 1017 0.0 0.0 0.0
1981 4142 0.0 0.0 0.0
1982 5884 0.0 0.0 0.0
1983 1467 0.0 0.0 0.0
1984 1038 0.0 0.0 0.0
1985 695 0.0 0.0 0.0
1986 211 0.0 0.0 0.0
1987 404 0.0 0.0 0.0
1988 238 0.0 0.0 0.0
1989 578 0.0 0.0 0.0
1991 300 0.0 0.0 0.0
1992 243 0.0 0.0 0.0
1993 48 0.0 0.0 0.0

For data sources see[5]

References