X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605033406000

Well Details

Well ID: 0605033406000
Loading map...
Location: 00/06-34-060-03W5/0
Location Alias: 00/06-34-60-03 W5M
Location Alias 2: 00/06-34-060-03 W5/00
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 03
Section: 34
County/Municipality: County of Barrhead No. 11
Well Name: LONG RUN MELLOW 6-34-60-3
Operator Name: Long Run Exploration Ltd.
License Number: 0041023
License Date: 1971-10-08
License Status: Abandoned
Spud Date: 1971-10-10
Final Drill Date: 1971-10-17
Well Total Depth: 1487.40 m
Surface Hole Latitude: 54.229475
Surface Hole Longitude: -114.369048

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1971-10-08 Obtained License
1971-10-12 Drill Stem Test Performed
1971-10-17 Finished Drilling
1971-10-17 Well Mode changed to Drilled and Cased
1971-10-20 Drill Stem Test Performed
1971-10-21 Production Casing Operation Performed
1971-12-28 Perforation Treatment Performed - Jet Perforation
1985-09-20 Well Fluid changed to Gas
1985-09-20 Well Mode changed to Testing
1985-09-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-09-21 Plug Back Performed
1985-09-21 Well Fluid changed to Gas
1985-09-21 Well Mode changed to Abandoned Zone
1985-09-22 Perforation Treatment Performed - Jet Perforation
2003-10-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-10-15 Perforation Treatment Performed - Jet Perforation
2003-10-15 Plug Back Performed
2003-10-16 Perforation Treatment Performed - Jet Perforation
2003-10-16 Perforation Treatment Performed - Remedial Casing
2003-10-18 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1971-12-28 Perforation 1069.80 1071.70 7
2003-10-16 Remedial Casing Cementing 378.00 379.00 0
1971-12-28 Perforation 1038.10 1040.00 7
1985-09-21 Packing Device Capped w/Cement 1055.40 1063.40 0
1985-09-21 Packing Device Capped w/Cement 1023.70 1031.70 0
1985-09-22 Perforation 871.40 872.30 14
2003-10-15 Packing Device Capped w/Cement 852.00 860.00 0
2003-10-15 Perforation 416.00 417.00 10
2003-10-16 Remedial Casing Cementing 416.00 417.00 0
2003-10-16 Perforation 378.00 379.00 10

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1975 1416 0.0 0.0 0.0

For data sources see[5]

References