X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0605030314002

Well Details

Well ID: 0605030314002
Loading map...
Location: 00/14-03-060-03W5/2
Location Alias: 00/14-03-60-03 W5M
Location Alias 2: 00/14-03-060-03 W5/02
Country: Canada
Province: Alberta
Township: 060
Meridian: 5
Range: 03
Section: 03
County/Municipality: County of Barrhead No. 11
Well Name: WLEC MELLOW 14-3-60-3
Operator Name: West Lake Energy Corp.
License Number: 0108553
License Date: 1984-08-02
License Status: Issued
Spud Date: 1984-08-03
Final Drill Date: 1984-08-06
Well Total Depth: 1140.00 m
Surface Hole Latitude: 54.163441
Surface Hole Longitude: -114.370047

For data sources see[1][2]

Well History

Date Event
1984-08-02 Obtained License
1984-08-04 Surface Casing Operation Performed
1984-08-06 Finished Drilling
1984-08-06 Well Log Performed
1984-08-06 Well Mode changed to Drilled and Cased
1984-08-07 Drill Stem Test Performed
1984-08-08 Production Casing Operation Performed
1984-08-08 Rig Released
1984-09-01 Well Log Performed
1984-09-02 Perforation Treatment Performed - Jet Perforation
1984-09-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-09-04 Well Log Performed
1984-09-05 Perforation Treatment Performed - Jet Perforation
1988-08-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-08-15 Perforation Treatment Performed - Jet Perforation
1988-08-15 Plug Back Performed
1988-08-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-08-19 Well Began Injection
1988-08-19 Well Fluid changed to Water
1988-08-19 Well Type changed to Disposal
1993-09-21 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-09-02 Perforation 1112.20 1114.30 13
1984-09-03 Acid Treatment 1112.20 1114.30 0
1984-09-05 Perforation 1108.50 1110.00 9
1984-09-05 Perforation 1104.00 1105.50 9
1988-08-15 Packing Device Capped w/Cement 1092.00 1100.00 0
1988-08-15 Perforation 888.00 890.00 13
1988-08-17 Acid Treatment 888.00 890.00 0
1993-09-21 Acid Treatment 888.00 890.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[5]

References