X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0604242616003

Well Details

Well ID: 0604242616003
Loading map...
Location: 00/16-26-060-24W4/3
Location Alias: 00/16-26-60-24 W4M
Location Alias 2: 00/16-26-060-24 W4/03
Country: Canada
Province: Alberta
Township: 060
Meridian: 4
Range: 24
Section: 26
County/Municipality: Westlock County
Well Name: HOUSTON NESTOW 16-26-60-24
Operator Name: Houston Oil & Gas Ltd.
License Number: 0004964
License Date: 1952-07-08
License Status: Issued
Spud Date: 1952-07-13
Final Drill Date: 1952-08-18
Well Total Depth: 1253.30 m
Surface Hole Latitude: 54.222949
Surface Hole Longitude: -113.478641

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-07-08 Obtained License
1952-07-21 Drill Stem Test Performed
1952-07-23 Drill Stem Test Performed
1952-07-24 Drill Stem Test Performed
1952-07-26 Drill Stem Test Performed
1952-07-27 Drill Stem Test Performed
1952-07-29 Drill Stem Test Performed
1952-08-02 Drill Stem Test Performed
1952-08-03 Drill Stem Test Performed
1952-08-08 Drill Stem Test Performed
1952-08-18 Drill Stem Test Performed
1952-08-18 Finished Drilling
1952-08-18 Well Mode changed to Drilled and Cased
1952-08-27 Production Casing Operation Performed
1952-08-29 Perforation Treatment Performed - Jet Perforation
1977-07-22 Perforation Treatment Performed - Jet Perforation
1981-12-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1981-12-12 Perforation Treatment Performed - Jet Perforation
1981-12-15 Well Began Production
1981-12-15 Well Fluid changed to Gas
1981-12-15 Well Mode changed to Flowing
1992-08-06 Perforation Treatment Performed - Jet Perforation
1992-08-06 Well Log Performed
1993-08-18 Perforation Treatment Performed - Cement Squeeze
1993-08-18 Plug Back Performed
1993-08-18 Well Fluid changed to Gas
1993-08-18 Well Mode changed to Abandoned Zone
1993-08-21 Perforation Treatment Performed - Jet Perforation
1995-08-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-08-17 Plug Back Performed
1995-08-18 Perforation Treatment Performed - Jet Perforation
1995-08-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-08-19 Perforation Treatment Performed - Jet Perforation
1995-08-21 Perforation Treatment Performed - Jet Perforation
2007-08-01 Well Structure changed to Commingled
2007-08-19 Perforation Treatment Performed - Jet Perforation
2007-08-19 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-08-29 Perforation 884.50 895.20 13
1995-08-17 Packing Device Capped w/Cement 872.00 880.00 0
1995-08-17 Packing Device Capped w/Cement 841.00 849.00 0
1995-08-18 Perforation 807.30 808.50 17
1995-08-19 Packing Device Capped w/Cement 817.00 825.00 0
1995-08-19 Perforation 793.00 794.20 17
1995-08-21 Perforation 536.00 539.00 13
2007-08-19 Perforation 766.30 771.10 17
2007-08-19 Perforation 707.40 710.50 17
2007-08-19 Perforation 702.30 704.10 17
1977-07-22 Perforation 766.00 766.90 13
1977-07-22 Perforation 767.50 768.70 13
1977-07-22 Perforation 769.60 771.10 13
1981-12-10 Packing Device Capped w/Cement 883.00 883.00 0
1981-12-12 Perforation 702.10 704.10 13
1992-08-06 Perforation 707.50 710.00 13
1993-08-18 Cement Squeeze 702.10 771.10 0
1993-08-21 Perforation 851.00 852.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 400 0.0 0.0 0.0
1982 5582 0.0 0.0 0.0
1983 3223 0.0 0.0 0.0
1984 2947 0.0 0.0 0.0
1985 4356 0.0 0.0 0.0
1986 5430 0.0 0.0 0.0
1987 3662 0.0 0.0 0.0
1988 4992 0.0 0.0 0.0
1989 4254 0.0 0.0 0.0
1990 839 0.0 0.0 0.0
1992 2589 0.0 0.0 0.0
1993 5399 0.0 0.0 0.0

For data sources see[5]

References