X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0604233413000

Well Details

Well ID: 0604233413000
Loading map...
Location: 00/13-34-060-23W4/0
Location Alias: 00/13-34-60-23 W4M
Location Alias 2: 00/13-34-060-23 W4/00
Country: Canada
Province: Alberta
Township: 060
Meridian: 4
Range: 23
Section: 34
County/Municipality: Thorhild County
Well Name: HOUSTON NESTOW 13-34-60-23
Operator Name: Houston Oil & Gas Ltd.
License Number: 0150037
License Date: 1991-09-16
License Status: Issued
Spud Date: 1991-09-17
Final Drill Date: 1991-09-20
Well Total Depth: 920.00 m
Surface Hole Latitude: 54.236299
Surface Hole Longitude: -113.369824

For data sources see[1][2]

Well History

Date Event
1991-09-16 Obtained License
1991-09-17 Surface Casing Operation Performed
1991-09-20 Drill Stem Test Performed
1991-09-20 Finished Drilling
1991-09-20 Well Log Performed
1991-09-20 Well Mode changed to Drilled and Cased
1991-09-21 Drill Stem Test Performed
1991-09-22 Production Casing Operation Performed
1991-09-23 Rig Released
1991-09-26 Well Log Performed
1991-10-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-10-01 Perforation Treatment Performed - Jet Perforation
1991-10-02 Perforation Treatment Performed - Jet Perforation
1991-11-17 Well Began Production
1991-11-17 Well Fluid changed to Gas
1991-11-17 Well Mode changed to Flowing
1995-09-30 Well Fluid changed to Gas
1995-09-30 Well Mode changed to Suspended
2001-10-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-10-18 Perforation Treatment Performed - Bridge Plug No Cement Required
2001-10-18 Perforation Treatment Performed - Jet Perforation
2001-10-18 Plug Back Performed
2001-10-18 Well Fluid changed to Gas
2001-10-18 Well Mode changed to Abandoned Zone
2007-06-27 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1991-10-01 Perforation 890.00 891.00 15
2007-06-27 Fracture 818.50 820.00 0
1991-10-01 Perforation 893.00 893.50 15
1991-10-01 Acid Treatment 890.00 893.50 0
1991-10-02 Perforation 832.00 833.50 14
1991-10-02 Perforation 856.00 857.50 14
2001-10-18 Packing Device Capped w/Cement 874.00 882.00 0
2001-10-18 Packing Device Capped w/Cement 842.00 850.00 0
2001-10-18 Bridge Plug, No Cement 828.00 828.00 0
2001-10-18 Perforation 818.50 820.00 14

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1991 1064 0.0 0.0 0.0
1992 8508 0.0 0.0 0.0
1993 8548 0.0 0.0 0.0
1994 8611 0.0 0.0 0.0
1995 5526 0.0 0.0 0.0

For data sources see[5]

References