X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0604222905003

Well Details

Well ID: 0604222905003
Loading map...
Location: 00/05-29-060-22W4/3
Location Alias: 00/05-29-60-22 W4M
Location Alias 2: 00/05-29-060-22 W4/03
Country: Canada
Province: Alberta
Township: 060
Meridian: 4
Range: 22
Section: 29
County/Municipality: Thorhild County
Well Name: NYTIS THORH 5-29-60-22
Operator Name: Predator Oil BC Ltd.
License Number: 0166861
License Date: 1994-05-04
License Status: RecCertified
Spud Date: 1994-05-10
Final Drill Date: 1994-05-13
Well Total Depth: 871.00 m
Surface Hole Latitude: 54.214663
Surface Hole Longitude: -113.270239

For data sources see[1][2]

Well History

Date Event
1994-05-04 Obtained License
1994-05-11 Surface Casing Operation Performed
1994-05-13 Drill Stem Test Performed
1994-05-13 Finished Drilling
1994-05-13 Well Log Performed
1994-05-13 Well Mode changed to Drilled and Cased
1994-05-14 Drill Stem Test Performed
1994-05-15 Production Casing Operation Performed
1994-05-15 Rig Released
1998-08-10 Perforation Treatment Performed - Jet Perforation
1998-08-15 Perforation Treatment Performed - Jet Perforation
1999-11-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-11-10 Perforation Treatment Performed - Jet Perforation
1999-11-10 Plug Back Performed
1999-11-26 Perforation Treatment Performed - Fractured
1999-12-01 Well Began Production
1999-12-01 Well Fluid changed to Gas
1999-12-01 Well Mode changed to Flowing
2000-05-18 Well Fluid changed to Gas
2000-05-18 Well Mode changed to Suspended
2001-08-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-08-07 Plug Back Performed
2001-08-07 Well Fluid changed to Gas
2001-08-07 Well Mode changed to Abandoned Zone
2001-08-14 Well Abandoned
2001-08-14 Well Fluid changed to Gas
2001-08-14 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1998-08-10 Perforation 779.40 782.30 14
1998-08-15 Perforation 681.00 683.20 14
1998-08-15 Perforation 685.00 688.10 14
1999-11-10 Packing Device Capped w/Cement 767.00 775.00 0
1999-11-10 Packing Device Capped w/Cement 669.00 677.00 0
1999-11-10 Perforation 513.00 519.00 13
1999-11-26 Fracture 513.00 519.00 0
2001-08-07 Packing Device Capped w/Cement 497.00 505.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 408 0.0 0.0 0.0

For data sources see[5]

References