X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0604203410002

Well Details

Well ID: 0604203410002
Loading map...
Location: 00/10-34-060-20W4/2
Location Alias: 00/10-34-60-20 W4M
Location Alias 2: 00/10-34-060-20 W4/02
Country: Canada
Province: Alberta
Township: 060
Meridian: 4
Range: 20
Section: 34
County/Municipality: Thorhild County
Well Name: CNRL D-1 HOLLOW 10-34-60-20
Operator Name: Canadian Natural Resources Limited
License Number: 0055535
License Date: 1975-10-24
License Status: Abandoned
Spud Date: 1975-10-27
Final Drill Date: 1975-11-01
Well Total Depth: 735.80 m
Surface Hole Latitude: 54.234988
Surface Hole Longitude: -112.908695

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-10-24 Obtained License
1975-11-01 Finished Drilling
1975-11-04 Drill Stem Test Performed
1975-11-05 Production Casing Operation Performed
1976-01-11 Perforation Treatment Performed - Jet Perforation
1976-03-10 Perforation Treatment Performed - Cement Squeeze
1976-03-10 Perforation Treatment Performed - Jet Perforation
1976-03-13 Perforation Treatment Performed - Jet Perforation
1976-03-15 Perforation Treatment Performed - Acid Wash - No Pressure
1976-03-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-05-05 Perforation Treatment Performed - Cement Squeeze
1976-05-16 Perforation Treatment Performed - Cement Squeeze
1976-05-17 Perforation Treatment Performed - Cement Squeeze
1976-05-18 Perforation Treatment Performed - Bullet Perforation
1976-05-20 Perforation Treatment Performed - Alcohol Squeeze
1976-05-24 Perforation Treatment Performed - Fractured
1976-07-23 Perforation Treatment Performed - Jet Perforation
1976-07-23 Well Mode changed to Drilled and Cased
1977-02-14 Well Began Production
1977-02-14 Well Fluid changed to Gas
1977-02-14 Well Mode changed to Flowing
1983-06-05 Perforation Treatment Performed - Jet Perforation
1985-11-01 Well Fluid changed to Gas
1985-11-01 Well Mode changed to Suspended
1987-04-13 Well Fluid changed to Gas
1987-04-13 Well Mode changed to Flowing
1987-04-27 Well Fluid changed to Gas
1987-04-27 Well Mode changed to Suspended
1987-07-01 Well Fluid changed to Gas
1987-07-01 Well Mode changed to Flowing
1990-05-30 Well Fluid changed to Gas
1990-05-30 Well Mode changed to Suspended
1992-10-07 Well Fluid changed to Gas
1992-10-07 Well Mode changed to Flowing
2004-06-30 Well Fluid changed to Gas
2004-06-30 Well Mode changed to Suspended
2008-01-17 Perforation Treatment Performed - Jet Perforation
2008-01-17 Well Log Performed
2010-08-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-08-18 Plug Back Performed
2010-08-19 Well Log Performed
2010-08-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-08-20 Perforation Treatment Performed - Jet Perforation
2010-08-20 Plug Back Performed
2010-08-20 Well Fluid changed to Gas
2010-08-20 Well Log Performed
2010-08-20 Well Mode changed to Abandoned Zone
2010-08-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-08-21 Perforation Treatment Performed - Remedial Casing
2010-12-09 Well Abandoned
2010-12-09 Well Fluid changed to Gas
2010-12-09 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-01-11 Perforation 709.00 712.60 13
1976-05-17 Cement Squeeze 709.00 712.60 0
1976-05-18 Bullet Perforation 709.00 711.40 13
1976-05-20 Alchohol Squeeze 709.00 711.40 0
1976-05-24 Fracture 709.00 711.40 0
1976-07-23 Perforation 637.00 641.30 13
1983-06-05 Perforation 708.90 711.40 13
2008-01-17 Perforation 637.00 641.30 20
2010-08-18 Packing Device Capped w/Cement 691.00 699.00 0
2010-08-20 Perforation 305.00 308.00 13
2010-08-20 Packing Device Capped w/Cement 625.00 633.00 0
1976-01-11 Perforation 714.50 716.30 13
2010-08-21 Packing Device Capped w/Cement 198.80 310.00 0
2010-08-21 Remedial Casing Cementing 305.00 308.00 0
1976-03-10 Perforation 719.30 723.00 13
1976-03-10 Cement Squeeze 709.00 723.00 0
1976-03-13 Perforation 709.00 712.60 13
1976-03-15 Acid Wash 709.00 712.60 0
1976-03-18 Acid Treatment 709.00 712.60 0
1976-05-05 Cement Squeeze 714.50 716.30 0
1976-05-16 Cement Squeeze 709.00 723.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1977 4334 0.0 0.0 0.0
1978 6033 0.0 0.0 0.0
1979 4128 0.0 0.0 0.0
1980 3799 0.0 0.0 0.0
1981 2196 0.0 0.0 0.0
1982 4000 0.0 0.0 0.0
1983 2638 0.0 0.0 0.0
1984 2243 0.0 0.0 0.0
1985 1704 0.0 0.0 0.0
1987 2533 0.0 0.0 0.0
1988 2728 0.0 0.0 0.0
1989 2719 0.0 0.0 0.0
1990 462 0.0 0.0 0.0
1992 1552 0.0 0.0 0.0
1993 7963 0.0 0.0 0.0
1994 8566 0.0 0.0 0.0
1995 6551 0.0 0.0 0.0
1996 8012 0.0 0.0 0.0
1997 6127 0.0 0.0 0.0

For data sources see[5]

References