X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0604200906002

Well Details

Well ID: 0604200906002
Loading map...
Location: 00/06-09-060-20W4/2
Location Alias: 00/06-09-60-20 W4M
Location Alias 2: 00/06-09-060-20 W4/02
Country: Canada
Province: Alberta
Township: 060
Meridian: 4
Range: 20
Section: 09
County/Municipality: Thorhild County
Well Name: CONOCO RADWAY 6-9-60-20
Operator Name: ConocoPhillips Canada Resources Corp.
License Number: 0145768
License Date: 1990-10-09
License Status: RecCertified
Spud Date: 1990-10-10
Final Drill Date: 1990-10-13
Well Total Depth: 780.00 m
Surface Hole Latitude: 54.171165
Surface Hole Longitude: -112.939332

For data sources see[1][2]

Well History

Date Event
1990-10-09 Obtained License
1990-10-11 Surface Casing Operation Performed
1990-10-13 Drill Stem Test Performed
1990-10-13 Finished Drilling
1990-10-13 Well Log Performed
1990-10-13 Well Mode changed to Drilled and Cased
1990-10-14 Drill Stem Test Performed
1990-10-14 Production Casing Operation Performed
1990-10-15 Rig Released
1990-10-17 Perforation Treatment Performed - Jet Perforation
1991-11-27 Perforation Treatment Performed - Cement Squeeze
1991-11-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-11-29 Perforation Treatment Performed - Jet Perforation
1991-11-29 Plug Back Performed
1991-11-30 Well Began Production
1991-11-30 Well Fluid changed to Gas
1991-11-30 Well Mode changed to Flowing
1993-03-01 Well Fluid changed to Gas
1993-03-01 Well Mode changed to Suspended
1993-06-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-06-04 Perforation Treatment Performed - Jet Perforation
1993-06-04 Plug Back Performed
1993-06-04 Well Fluid changed to Gas
1993-06-04 Well Mode changed to Abandoned Zone
1993-11-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-11-02 Perforation Treatment Performed - Jet Perforation
1993-11-02 Plug Back Performed
1993-11-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-11-03 Plug Back Performed
1993-11-03 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-10-17 Perforation 755.00 756.50 13
1993-11-02 Perforation 702.50 704.00 13
1993-11-03 Packing Device Capped w/Cement 687.00 695.00 0
1991-11-27 Cement Squeeze 755.00 756.50 0
1991-11-29 Perforation 755.00 756.00 13
1991-11-29 Packing Device Capped w/Cement 751.00 754.00 0
1991-11-29 Perforation 748.00 749.00 13
1991-11-29 Perforation 730.00 732.00 13
1993-06-04 Packing Device Capped w/Cement 721.00 724.00 0
1993-06-04 Perforation 715.50 718.00 13
1993-11-02 Packing Device Capped w/Cement 707.50 710.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1991 460 0.0 0.0 0.0
1992 7010 0.0 0.0 0.0

For data sources see[5]

References