X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0604191606003

Well Details

Well ID: 0604191606003
Loading map...
Location: 00/06-16-060-19W4/3
Location Alias: 00/06-16-60-19 W4M
Location Alias 2: 00/06-16-060-19 W4/03
Country: Canada
Province: Alberta
Township: 060
Meridian: 4
Range: 19
Section: 16
County/Municipality: Smoky Lake County
Well Name: APF WOODLAND 6-16-60-19
Operator Name: Obsidian Energy Ltd.
License Number: 0041594
License Date: 1971-12-10
License Status: Abandoned
Spud Date: 1971-12-21
Final Drill Date: 1972-01-01
Well Total Depth: 769.60 m
Surface Hole Latitude: 54.185066
Surface Hole Longitude: -112.789087

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1971-12-10 Obtained License
1972-01-01 Drill Stem Test Performed
1972-01-01 Finished Drilling
1972-01-01 Well Mode changed to Drilled and Cased
1972-01-03 Drill Stem Test Performed
1972-01-04 Production Casing Operation Performed
1974-10-30 Perforation Treatment Performed - Jet Perforation
1986-05-22 Perforation Treatment Performed - Jet Perforation
1988-03-02 Perforation Treatment Performed - Cement Squeeze
1988-03-02 Plug Back Performed
1988-03-03 Perforation Treatment Performed - Cement Squeeze
1988-03-03 Plug Back Performed
1988-03-05 Perforation Treatment Performed - Jet Perforation
1988-03-08 Perforation Treatment Performed - Jet Perforation
1988-05-01 Well Began Production
1988-05-01 Well Fluid changed to Gas
1988-05-01 Well Mode changed to Flowing
1993-02-01 Well Fluid changed to Gas
1993-02-01 Well Mode changed to Suspended
1998-06-05 Well Log Performed
1998-07-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-07-06 Perforation Treatment Performed - Cement Squeeze
1998-07-06 Plug Back Performed
1998-07-06 Well Fluid changed to Gas
1998-07-06 Well Mode changed to Abandoned Zone
1998-07-09 Perforation Treatment Performed - Jet Perforation
1998-07-09 Well Log Performed
1998-07-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-07-11 Perforation Treatment Performed - Jet Perforation
1998-07-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-09-25 Perforation Treatment Performed - Jet Perforation
1998-09-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-10-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-10-29 Perforation Treatment Performed - Cement Squeeze
1998-10-29 Plug Back Performed
1998-11-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-11-03 Plug Back Performed
2003-10-19 Well Log Performed
2003-10-21 Perforation Treatment Performed - Jet Perforation
2003-10-22 Perforation Treatment Performed - Remedial Casing
2003-10-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-11-09 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1974-10-30 Perforation 714.50 716.30 7
1998-07-10 Acid Treatment 714.50 716.00 0
1998-07-11 Perforation 735.00 739.00 14
1998-07-12 Acid Treatment 735.00 739.00 0
1998-09-25 Perforation 711.00 712.00 13
1998-09-25 Perforation 713.50 714.50 13
1998-09-25 Perforation 717.00 719.00 13
1998-09-26 Acid Treatment 711.00 714.50 0
1998-09-26 Acid Treatment 717.00 719.00 0
1998-10-29 Packing Device Capped w/Cement 688.80 734.00 0
1998-10-29 Cement Squeeze 683.30 684.40 0
1986-05-22 Perforation 627.20 631.00 13
1998-11-03 Packing Device Capped w/Cement 617.00 625.00 0
2003-10-21 Perforation 335.00 335.30 13
2003-10-22 Remedial Casing Cementing 335.00 335.30 0
2003-10-30 Packing Device Capped w/Cement 322.00 330.00 0
1988-03-02 Cement Squeeze 714.40 716.20 0
1988-03-03 Cement Squeeze 627.20 631.00 0
1988-03-05 Perforation 711.00 712.00 13
1988-03-08 Perforation 683.30 684.30 13
1998-07-06 Cement Squeeze 711.00 712.00 0
1998-07-06 Acid Treatment 683.30 684.40 0
1998-07-09 Perforation 714.50 716.00 14

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 849 0.0 0.0 0.0
1989 168 0.0 0.0 0.0
1990 251 0.0 0.0 0.0

For data sources see[5]

References