X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0604160113000

Well Details

Well ID: 0604160113000
Loading map...
Location: 00/13-01-060-16W4/0
Location Alias: 00/13-01-60-16 W4M
Location Alias 2: 00/13-01-060-16 W4/00
Country: Canada
Province: Alberta
Township: 060
Meridian: 4
Range: 16
Section: 01
County/Municipality: Smoky Lake County
Well Name: BP BELLIS 13-1-60-16
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0137700
License Date: 1988-12-16
License Status: RecCertified
Spud Date: 1988-12-21
Final Drill Date: 1988-12-28
Well Total Depth: 710.00 m
Surface Hole Latitude: 54.163173
Surface Hole Longitude: -112.271568

For data sources see[1][2]

Well History

Date Event
1988-12-16 Obtained License
1988-12-22 Surface Casing Operation Performed
1988-12-27 Direction Drilling Operation Performed - Deviate
1988-12-28 Finished Drilling
1988-12-28 Well Log Performed
1988-12-29 Drill Stem Test Performed
1988-12-29 Well Log Performed
1988-12-30 Drill Stem Test Performed
1988-12-31 Production Casing Operation Performed
1988-12-31 Rig Released
1988-12-31 Well Mode changed to Drilled and Cased
1992-06-01 Perforation Treatment Performed - Jet Perforation
1992-06-01 Well Log Performed
1997-11-18 Well Log Performed
1997-11-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-11-27 Perforation Treatment Performed - Jet Perforation
1997-11-27 Plug Back Performed
1997-11-27 Well Log Performed
1997-12-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-12-15 Perforation Treatment Performed - Remedial Casing
1998-05-21 Perforation Treatment Performed - Jet Perforation
1998-06-21 Perforation Treatment Performed - Remedial Casing
1998-08-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-08-26 Well Log Performed
1998-10-31 Well Abandoned
1998-10-31 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1988-12-27 294.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1992-06-01 Perforation 553.50 556.00 14
1998-08-26 Packing Device Capped w/Cement 222.00 230.00 0
1997-11-27 Packing Device Capped w/Cement 537.00 545.00 0
1997-11-27 Perforation 454.00 454.30 86
1997-11-27 Perforation 446.00 446.30 86
1997-12-09 Acid Treatment 446.00 446.30 0
1997-12-15 Remedial Casing Cementing 446.00 454.30 0
1998-05-21 Perforation 371.00 371.30 99
1998-05-21 Perforation 367.00 367.30 99
1998-06-21 Remedial Casing Cementing 367.00 371.30 0

For data sources see[5]



References