X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0604150906002

Well Details

Well ID: 0604150906002
Loading map...
Location: 00/06-09-060-15W4/2
Location Alias: 00/06-09-60-15 W4M
Location Alias 2: 00/06-09-060-15 W4/02
Country: Canada
Province: Alberta
Township: 060
Meridian: 4
Range: 15
Section: 09
County/Municipality: Smoky Lake County
Well Name: CNRL BELLIS 6-9-60-15
Operator Name: Canadian Natural Resources Limited
License Number: 0066003
License Date: 1977-10-04
License Status: Issued
Spud Date: 1977-11-04
Final Drill Date: 1977-11-10
Well Total Depth: 655.30 m
Surface Hole Latitude: 54.170499
Surface Hole Longitude: -112.193117

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-10-04 Obtained License
1977-11-07 Kick Occurred
1977-11-10 Finished Drilling
1977-11-10 Kick Occurred
1977-11-10 Lost Circulation Occurred
1977-11-10 Well Mode changed to Drilled and Cased
1977-11-15 Production Casing Operation Performed
1978-01-10 Perforation Treatment Performed - Open-Hole Completion
1978-01-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-01-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1978-01-13 Perforation Treatment Performed - Jet Perforation
1978-01-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1978-01-16 Perforation Treatment Performed - Jet Perforation
1978-01-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1978-01-17 Perforation Treatment Performed - Jet Perforation
1978-01-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-01-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1978-01-19 Perforation Treatment Performed - Jet Perforation
1978-01-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-01-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1978-01-23 Perforation Treatment Performed - Jet Perforation
1978-01-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-01-25 Perforation Treatment Performed - Fractured
1978-01-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-01-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1978-01-28 Perforation Treatment Performed - Jet Perforation
1978-01-31 Perforation Treatment Performed - Jet Perforation
1978-02-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-02-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-02-02 Perforation Treatment Performed - Jet Perforation
1978-04-19 Well Began Production
1978-04-19 Well Fluid changed to Gas
1978-04-19 Well Mode changed to Flowing
2000-10-20 Well Fluid changed to Gas
2000-10-20 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-01-10 Open Hole/Barefoot Completion 650.10 654.40 0
1978-01-19 Packing Device Capped w/Cement 603.50 603.50 0
1978-01-19 Perforation 574.50 578.50 7
1978-01-20 Acid Treatment 574.50 578.50 0
1978-01-23 Packing Device Capped w/Cement 571.50 571.50 0
1978-01-23 Perforation 561.40 562.70 7
1978-01-24 Acid Treatment 561.40 562.70 0
1978-01-25 Fracture 561.40 562.70 0
1978-01-28 Packing Device Capped w/Cement 557.80 557.80 0
1978-01-28 Perforation 526.70 527.90 7
1978-01-28 Acid Treatment 526.70 527.90 0
1978-01-11 Acid Treatment 650.10 654.40 0
1978-01-31 Perforation 520.60 523.00 7
1978-01-31 Perforation 487.70 493.80 3
1978-02-01 Acid Treatment 487.70 493.80 0
1978-02-02 Perforation 480.70 482.80 7
1978-02-02 Acid Treatment 480.70 482.80 0
1978-01-13 Packing Device Capped w/Cement 649.20 649.20 0
1978-01-13 Perforation 639.20 641.00 7
1978-01-16 Packing Device Capped w/Cement 635.50 635.50 0
1978-01-16 Perforation 627.90 629.70 7
1978-01-17 Packing Device Capped w/Cement 624.80 624.80 0
1978-01-17 Perforation 606.60 610.80 7
1978-01-18 Acid Treatment 606.60 610.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1978 2735 0.0 0.0 0.0
1990 583 0.0 0.0 0.0
1991 191 0.0 0.0 0.0
1992 909 0.0 0.0 0.0
1993 233 0.0 0.0 0.0
1996 584 0.0 0.0 0.0
1997 787 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1977-11-07 Kick 346.90 346.90
1977-11-10 Kick 655.30 655.30
1977-11-10 Lost Circulation 655.30 655.30

For data sources see[6]

References