X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0604061604000

Well Details

Well ID: 0604061604000
Loading map...
Location: 00/04-16-060-06W4/0
Location Alias: 00/04-16-60-06 W4M
Location Alias 2: 00/04-16-060-06 W4/00
Country: Canada
Province: Alberta
Township: 060
Meridian: 4
Range: 06
Section: 16
County/Municipality: Municipal District of Bonnyville No. 87
Well Name: CRESCENT POINT HOSELAW 4-16-60-6
Operator Name: Crescent Point Energy Corp.
License Number: 0209331
License Date: 1997-11-26
License Status: Suspension
Spud Date: 1997-11-28
Final Drill Date: 1997-12-01
Well Total Depth: 562.00 m
Surface Hole Latitude: 54.185053
Surface Hole Longitude: -110.851321

For data sources see[1][2]

Well History

Date Event
1997-11-26 Obtained License
1997-11-29 Surface Casing Operation Performed
1997-11-30 Direction Drilling Operation Performed - Deviate
1997-12-01 Drill Stem Test Performed
1997-12-01 Finished Drilling
1997-12-01 Well Log Performed
1997-12-02 Production Casing Operation Performed
1997-12-03 Rig Released
1997-12-03 Well Mode changed to Drilled and Cased
1997-12-16 Well Log Performed
1998-01-06 Perforation Treatment Performed - Jet Perforation
1998-06-17 Well Began Production
1998-06-17 Well Fluid changed to Gas
1998-06-17 Well Mode changed to Flowing
1998-08-18 Perforation Treatment Performed - Jet Perforation
1998-08-18 Well Log Performed
2019-11-01 Well Fluid changed to Gas
2019-11-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1997-11-30 127.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1998-01-06 Perforation 372.00 375.00 20
1998-08-18 Perforation 409.00 410.00 20
1998-08-18 Perforation 384.00 385.00 20
1998-08-18 Perforation 396.00 397.00 20
1998-08-18 Perforation 401.00 402.00 20

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 4916 0.0 0.0 0.0
1999 7947 0.0 0.0 0.0
2000 7871 0.0 0.0 0.0
2001 8219 0.0 0.0 0.0
2002 8043 0.0 0.0 0.0
2003 7317 0.0 0.0 0.0
2004 8240 0.0 0.0 0.0
2005 8631 0.0 0.0 0.0
2006 7784 0.0 0.0 0.0
2007 8486 0.0 0.0 0.0
2008 8370 0.0 0.0 0.0
2009 8176 0.0 0.0 0.0
2010 8747 0.0 0.0 0.0
2011 8722 0.0 0.0 0.0
2012 8644 0.0 0.0 0.0
2013 8512 0.0 0.0 0.0
2014 8553 0.0 0.0 0.0
2015 8667 0.0 0.0 0.0
2016 8758 0.0 0.0 0.0
2017 8751 0.0 0.0 0.0
2018 5061 0.0 0.0 0.0

For data sources see[6]

References