X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0604061310002

Well Details

Well ID: 0604061310002
Loading map...
Location: 00/10-13-060-06W4/2
Location Alias: 00/10-13-60-06 W4M
Location Alias 2: 00/10-13-060-06 W4/02
Country: Canada
Province: Alberta
Township: 060
Meridian: 4
Range: 06
Section: 13
County/Municipality: Municipal District of Bonnyville No. 87
Well Name: POCO HOSELAW 10-13-60-6
Operator Name: Crescent Point Energy Corp.
License Number: 0213799
License Date: 1998-02-24
License Status: Suspension
Spud Date: 1998-03-09
Final Drill Date: 1998-03-12
Well Total Depth: 576.00 m
Surface Hole Latitude: 54.189072
Surface Hole Longitude: -110.767057

For data sources see[1][2]

Well History

Date Event
1998-02-24 Obtained License
1998-03-10 Surface Casing Operation Performed
1998-03-12 Finished Drilling
1998-03-12 Well Log Performed
1998-03-12 Well Mode changed to Drilled and Cased
1998-03-13 Production Casing Operation Performed
1998-03-13 Rig Released
1998-03-19 Perforation Treatment Performed - Jet Perforation
1998-03-19 Well Log Performed
1998-03-20 Perforation Treatment Performed - Jet Perforation
1998-06-19 Well Log Performed
1998-06-20 Perforation Treatment Performed - Jet Perforation
1998-09-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-09-26 Perforation Treatment Performed - Jet Perforation
1998-09-26 Plug Back Performed
1998-09-26 Well Log Performed
1998-12-04 Well Began Production
1998-12-04 Well Fluid changed to Gas
1998-12-04 Well Mode changed to Flowing
2014-01-01 Well Fluid changed to Gas
2014-01-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1998-03-19 Perforation 407.00 408.50 20
1998-03-20 Perforation 379.50 380.50 18
1998-06-20 Perforation 401.00 402.00 14
1998-09-26 Packing Device Capped w/Cement 393.00 395.00 0
1998-09-26 Perforation 370.00 372.50 18

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 660 0.0 0.0 0.0
1999 8252 0.0 0.0 0.0
2000 8278 0.0 0.0 0.0
2001 8640 0.0 0.0 0.0
2002 8435 0.0 0.0 0.0
2003 6287 0.0 0.0 0.0
2004 8563 0.0 0.0 0.0
2005 8547 0.0 0.0 0.0
2006 7764 0.0 0.0 0.0
2007 7571 0.0 0.0 0.0
2008 7199 0.0 0.0 0.0
2009 6941 0.0 0.0 0.0
2010 8066 0.0 0.0 0.0
2011 4973 0.0 0.0 0.0

For data sources see[5]

References