X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0604010905002

Well Details

Well ID: 0604010905002
Loading map...
Location: 00/05-09-060-01W4/2
Location Alias: 00/05-09-60-01 W4M
Location Alias 2: 00/05-09-060-01 W4/02
Country: Canada
Province: Alberta
Township: 060
Meridian: 4
Range: 01
Section: 09
County/Municipality: Elizabeth Metis Settlement
Well Name: CRESCENT POINT MSHINE 5-9-60-1
Operator Name: Crescent Point Energy Corp.
License Number: 0100740
License Date: 1983-02-24
License Status: Abandoned
Spud Date: 1983-03-07
Final Drill Date: 1983-03-10
Well Total Depth: 625.00 m
Surface Hole Latitude: 54.173232
Surface Hole Longitude: -110.101576

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1983-02-24 Obtained License
1983-03-10 Finished Drilling
1983-03-10 Well Log Performed
1983-03-10 Well Mode changed to Drilled and Cased
1983-03-11 Drill Stem Test Performed
1983-03-12 Production Casing Operation Performed
1988-01-29 Well Log Performed
1988-02-08 Perforation Treatment Performed - Jet Perforation
1988-02-08 Well Log Performed
1988-02-12 Perforation Treatment Performed - Jet Perforation
1988-02-12 Well Log Performed
1999-03-16 Well Began Production
1999-03-16 Well Fluid changed to Gas
1999-03-16 Well Mode changed to Flowing
2014-09-01 Well Fluid changed to Gas
2014-09-01 Well Mode changed to Suspended
2020-02-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2020-02-10 Plug Back Performed
2020-02-10 Well Fluid changed to Gas
2020-02-10 Well Mode changed to Abandoned Zone
2020-03-03 Well Abandoned
2020-03-03 Well Fluid changed to Gas
2020-03-03 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-02-08 Perforation 425.50 426.00 13
1988-02-08 Perforation 427.00 427.50 13
1988-02-08 Perforation 393.00 395.00 13
1988-02-08 Perforation 396.00 397.00 13
1988-02-12 Perforation 424.80 426.80 13
1988-02-12 Perforation 427.80 428.30 13
2020-02-10 Packing Device Capped w/Cement 376.00 390.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 7088 0.0 0.0 0.0
2000 8747 0.0 0.0 0.0
2001 8757 0.0 0.0 0.0
2002 8578 0.0 0.0 0.0
2003 8495 0.0 0.0 0.0
2004 8761 0.0 0.0 0.0
2005 8653 0.0 0.0 0.0
2006 8635 0.0 0.0 0.0
2007 8618 0.0 0.0 0.0
2008 8700 0.0 0.0 0.0
2009 8596 0.0 0.0 0.0
2010 8682 0.0 0.0 0.0
2011 8291 0.0 0.0 0.0
2012 6383 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2020-02-10 No Incident Encountered 0.00 0.00

For data sources see[6]

References