X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0596052410000

Well Details

Well ID: 0596052410000
Loading map...
Location: 00/10-24-059-05W6/0
Location Alias: 00/10-24-59-05 W6M
Location Alias 2: 00/10-24-059-05 W6/00
Country: Canada
Province: Alberta
Township: 059
Meridian: 6
Range: 05
Section: 24
County/Municipality: Municipal District of Greenview No. 16
Well Name: OEI CHIME 10-24-59-5
Operator Name: AlphaBow Energy Ltd.
License Number: 0092071
License Date: 1981-09-02
License Status: Abandoned
Spud Date: 1981-09-17
Final Drill Date: 1982-03-23
Well Total Depth: 3494.00 m
Surface Hole Latitude: 54.118601
Surface Hole Longitude: -118.607335

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-09-02 Obtained License
1981-09-28 Lost Circulation Occurred
1981-10-01 Lost Circulation Occurred
1981-11-04 Well Log Performed
1981-11-06 Lost Circulation Occurred
1982-01-10 Well Log Performed
1982-01-15 Well Log Performed
1982-02-10 Production Casing Operation Performed
1982-03-23 Finished Drilling
1982-03-23 Well Log Performed
1982-03-24 Well Log Performed
1982-11-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-11-20 Perforation Treatment Performed - Jet Perforation
1982-11-25 Perforation Treatment Performed - Fractured
1982-12-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-12-10 Well Abandoned
1982-12-10 Well Mode changed to Abandoned
2012-08-12 Perforation Treatment Performed - Jet Perforation
2012-08-20 Perforation Treatment Performed - Jet Perforation
2012-08-21 Perforation Treatment Performed - Cement Squeeze
2012-08-21 Plug Back Performed
2012-08-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-08-22 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-11-20 Packing Device Capped w/Cement 2524.00 2532.00 0
1982-11-20 Perforation 2500.00 2506.00 7
1982-11-25 Fracture 2500.00 2506.00 0
1982-12-10 Packing Device Capped w/Cement 2467.00 2475.00 0
2012-08-12 Perforation 1111.00 1112.00 18
2012-08-20 Perforation 1635.00 1636.00 17
2012-08-21 Cement Squeeze 1111.00 1636.00 0
2012-08-22 Packing Device Capped w/Cement 1092.00 1100.00 0

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1981-09-28 Lost Circulation 931.00 964.00
1981-10-01 Lost Circulation 1251.00 1477.00
1981-11-06 Lost Circulation 2935.00 2935.00
2012-07-22 No Incident Encountered 0.00 0.00
2012-08-09 No Incident Encountered 0.00 0.00
2012-08-12 No Incident Encountered 0.00 0.00
2012-08-20 No Incident Encountered 0.00 0.00
2012-08-21 No Incident Encountered 0.00 0.00
2012-08-22 No Incident Encountered 0.00 0.00

For data sources see[5]

References