X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0596043315000

Well Details

Well ID: 0596043315000
Loading map...
Location: 00/15-33-059-04W6/0
Location Alias: 00/15-33-59-04 W6M
Location Alias 2: 00/15-33-059-04 W6/00
Country: Canada
Province: Alberta
Township: 059
Meridian: 6
Range: 04
Section: 33
County/Municipality: Municipal District of Greenview No. 16
Well Name: PEYTO SMOKY 15-33-59-4
Operator Name: Peyto Exploration & Development Corp.
License Number: 0423164
License Date: 2010-09-01
License Status: Issued
Spud Date: 2010-10-04
Final Drill Date: 2010-11-23
Well Total Depth: 4092.00 m
Surface Hole Latitude: 54.141242
Surface Hole Longitude: -118.512019

For data sources see[1][2]

Well History

Date Event
2010-09-01 Obtained License
2010-10-07 Surface Casing Operation Performed
2010-10-09 Well Log Performed
2010-10-10 Lost Circulation Occurred
2010-10-18 Direction Drilling Operation Performed - Horizontal
2010-10-29 Intermediate Casing Operation Performed
2010-11-23 Finished Drilling
2010-11-23 Well Mode changed to Drilled and Cased
2010-11-27 Liner Casing Operation Performed
2010-11-27 Perforation Treatment Performed - Open-Hole Completion
2010-11-27 Well Log Performed
2010-11-29 Rig Released
2010-12-06 Perforation Treatment Performed - Multi-Stage Fracture
2010-12-07 Perforation Treatment Performed - Multi-Stage Fracture
2010-12-09 Well Began Production
2010-12-09 Well Fluid changed to Gas
2010-12-09 Well Mode changed to Flowing
2013-11-01 Well Fluid changed to Gas
2013-11-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-10-18 2262.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-11-27 Open Hole/Barefoot Completion 4075.00 4092.00 0
2010-12-07 Multi-Stage Fracture 3131.60 3131.70 0
2010-12-07 Multi-Stage Fracture 3007.00 3007.10 0
2010-12-07 Multi-Stage Fracture 2880.60 2880.70 0
2010-12-07 Multi-Stage Fracture 2769.00 2769.10 0
2010-12-06 Multi-Stage Fracture 4060.00 4060.10 0
2010-12-06 Multi-Stage Fracture 3973.00 3973.10 0
2010-12-06 Multi-Stage Fracture 3856.90 3857.00 0
2010-12-06 Multi-Stage Fracture 3758.70 3758.80 0
2010-12-06 Multi-Stage Fracture 3632.80 3632.90 0
2010-12-06 Multi-Stage Fracture 3493.40 3493.50 0
2010-12-06 Multi-Stage Fracture 3354.60 3354.70 0
2010-12-06 Multi-Stage Fracture 3269.90 3270.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 152 0.0 0.0 0.0
2011 1589 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8184 0.0 0.0 0.0
2017 8616 0.0 0.0 0.0
2018 8334 0.0 0.0 0.0
2019 8737 0.0 0.0 0.0
2020 2160 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2010-10-10 Lost Circulation 1060.00 2577.00

For data sources see[7]

References