X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0596040506006

Well Details

Well ID: 0596040506006
Loading map...
Location: 00/06-05-059-04W6/6
Location Alias: 00/06-05-59-04 W6M
Location Alias 2: 00/06-05-059-04 W6/06
Country: Canada
Province: Alberta
Township: 059
Meridian: 6
Range: 04
Section: 05
County/Municipality: Municipal District of Greenview No. 16
Well Name: ECA ECOG SMOKY 6-5-59-4
Operator Name: Jupiter Resources Inc.
License Number: 0391314
License Date: 2008-01-09
License Status: Issued
Spud Date: 2008-01-23
Final Drill Date: 2008-02-18
Well Total Depth: 3918.00 m
Surface Hole Latitude: 54.067153
Surface Hole Longitude: -118.561747

For data sources see[1][2]

Well History

Date Event
2008-01-09 Obtained License
2008-01-23 Lost Circulation Occurred
2008-01-28 Surface Casing Operation Performed
2008-01-29 Direction Drilling Operation Performed - Deviate
2008-02-07 Well Log Performed
2008-02-09 Intermediate Casing Operation Performed
2008-02-18 Finished Drilling
2008-02-18 Well Log Performed
2008-02-18 Well Mode changed to Drilled and Cased
2008-02-20 Production Casing Operation Performed
2008-02-20 Rig Released
2008-03-06 Well Log Performed
2008-03-12 Well Log Performed
2008-03-13 Perforation Treatment Performed - Fractured
2008-03-13 Perforation Treatment Performed - Jet Perforation
2008-03-13 Well Log Performed
2008-03-15 Perforation Treatment Performed - Jet Perforation
2008-03-15 Well Log Performed
2008-03-16 Perforation Treatment Performed - Fractured
2008-03-16 Well Log Performed
2008-03-17 Perforation Treatment Performed - Jet Perforation
2008-03-18 Perforation Treatment Performed - Fractured
2008-03-18 Perforation Treatment Performed - Jet Perforation
2008-03-18 Well Log Performed
2008-03-20 Perforation Treatment Performed - Fractured
2008-03-26 Well Structure changed to Commingled

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2008-01-29 634.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2008-03-13 Perforation 3869.50 3870.50 10
2008-03-16 Fracture 3625.50 3678.00 0
2008-03-17 Perforation 3567.50 3568.50 10
2008-03-17 Perforation 3557.50 3558.50 10
2008-03-18 Fracture 3557.50 3568.50 0
2008-03-18 Perforation 3322.50 3323.00 10
2008-03-18 Perforation 3269.50 3270.00 10
2008-03-18 Perforation 3263.50 3264.50 10
2008-03-18 Perforation 3258.50 3259.50 10
2008-03-18 Fracture 3258.50 3323.00 0
2008-03-18 Perforation 2746.50 2747.50 10
2008-03-13 Perforation 3867.50 3868.50 10
2008-03-18 Perforation 2703.50 2704.50 10
2008-03-20 Fracture 2703.50 2747.50 0
2008-03-13 Perforation 3851.50 3852.50 10
2008-03-13 Fracture 3851.50 3870.50 0
2008-03-15 Perforation 3727.00 3727.50 10
2008-03-15 Perforation 3677.50 3678.00 10
2008-03-15 Perforation 3642.00 3642.50 10
2008-03-15 Perforation 3625.50 3626.00 10
2008-03-16 Fracture 3727.00 3727.50 0

For data sources see[5]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2008-01-23 Lost Circulation 50.00 126.00

For data sources see[6]

References