X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0596031902002

Well Details

Well ID: 0596031902002
Loading map...
Location: 00/02-19-059-03W6/2
Location Alias: 00/02-19-59-03 W6M
Location Alias 2: 00/02-19-059-03 W6/02
Country: Canada
Province: Alberta
Township: 059
Meridian: 6
Range: 03
Section: 19
County/Municipality: Municipal District of Greenview No. 16
Well Name: CNRL SMOKY 2-19-59-3
Operator Name: Canadian Natural Resources Limited
License Number: 0310561
License Date: 2004-06-18
License Status: Issued
Spud Date: 2004-12-05
Final Drill Date: 2005-01-09
Well Total Depth: 2587.00 m
Surface Hole Latitude: 54.111428
Surface Hole Longitude: -118.432245

For data sources see[1][2]

Well History

Date Event
2004-06-18 Obtained License
2004-12-10 Surface Casing Operation Performed
2004-12-13 Lost Circulation Occurred
2004-12-18 Direction Drilling Operation Performed - Deviate
2004-12-24 Intermediate Casing Operation Performed
2005-01-06 Direction Drilling Operation Performed - Sidetrack Fish
2005-01-09 Finished Drilling
2005-01-09 Well Log Performed
2005-01-09 Well Mode changed to Drilled and Cased
2005-01-11 Production Casing Operation Performed
2005-01-11 Rig Released
2005-01-24 Perforation Treatment Performed - Jet Perforation
2005-01-24 Well Log Performed
2005-01-29 Perforation Treatment Performed - Fractured
2005-01-30 Well Fluid changed to Gas
2005-01-30 Well Mode changed to Testing
2005-01-31 Well Log Performed
2005-02-01 Perforation Treatment Performed - Jet Perforation
2005-02-03 Perforation Treatment Performed - Fractured
2005-02-15 Well Began Production
2005-02-15 Well Fluid changed to Gas
2005-02-15 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2004-12-18 1845.00 Deviate (5 - 79 degrees)
2005-01-06 2243.00 Sidetrack fish

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-01-24 Perforation 2546.00 2552.00 17
2005-01-29 Fracture 2546.00 2552.00 0
2005-02-01 Perforation 2501.50 2503.50 17
2005-02-01 Perforation 2506.50 2510.50 17
2005-02-03 Fracture 2501.50 2510.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 8060 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8475 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8711 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2004-12-13 Lost Circulation 969.00 1944.00

For data sources see[7]

References