X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0596021409000

Well Details

Well ID: 0596021409000
Loading map...
Location: 00/09-14-059-02W6/0
Location Alias: 00/09-14-59-02 W6M
Location Alias 2: 00/09-14-059-02 W6/00
Country: Canada
Province: Alberta
Township: 059
Meridian: 6
Range: 02
Section: 14
County/Municipality: Municipal District of Greenview No. 16
Well Name: JUPITER HZ SMOKY 9-14-59-2
Operator Name: Jupiter Resources Inc.
License Number: 0474954
License Date: 2015-03-10
License Status: Issued
Spud Date: 2015-09-10
Final Drill Date: 2015-10-08
Well Total Depth: 5333.00 m
Surface Hole Latitude: 54.101679
Surface Hole Longitude: -118.210650

For data sources see[1][2]

Well History

Date Event
2015-03-10 Obtained License
2015-09-13 Surface Casing Operation Performed
2015-09-17 Intermediate Casing Operation Performed
2015-09-20 Direction Drilling Operation Performed - Deviate
2015-09-24 Direction Drilling Operation Performed - Horizontal
2015-10-08 Finished Drilling
2015-10-08 Well Log Performed
2015-10-08 Well Mode changed to Drilled and Cased
2015-10-10 Production Casing Operation Performed
2015-10-10 Well Log Performed
2015-10-12 Rig Released
2015-12-16 Perforation Treatment Performed - Multi-Stage Fracture
2015-12-17 Perforation Treatment Performed - Multi-Stage Fracture
2015-12-18 Perforation Treatment Performed - Multi-Stage Fracture
2015-12-19 Perforation Treatment Performed - Multi-Stage Fracture
2016-03-08 Well Fluid changed to Gas
2016-03-08 Well Mode changed to Testing
2016-05-13 Well Began Production
2016-05-13 Well Fluid changed to Gas
2016-05-13 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2015-09-10 Horizon Drilling Inc. 40 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2015-09-20 2969.10 Deviate (5 - 79 degrees)
2015-09-24 3365.90 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-12-16 Multi-Stage Fracture 5289.60 5289.70 0
2015-12-17 Multi-Stage Fracture 4443.40 4443.50 0
2015-12-17 Multi-Stage Fracture 4357.30 4357.40 0
2015-12-17 Multi-Stage Fracture 4257.60 4257.70 0
2015-12-17 Multi-Stage Fracture 4167.20 4167.30 0
2015-12-17 Multi-Stage Fracture 4078.00 4078.10 0
2015-12-17 Multi-Stage Fracture 3988.50 3988.60 0
2015-12-17 Multi-Stage Fracture 3890.40 3890.50 0
2015-12-18 Multi-Stage Fracture 3804.20 3804.30 0
2015-12-18 Multi-Stage Fracture 3704.90 3705.00 0
2015-12-19 Multi-Stage Fracture 3618.70 3618.80 0
2015-12-16 Multi-Stage Fracture 5200.50 5200.60 0
2015-12-19 Multi-Stage Fracture 3519.00 3519.10 0
2015-12-19 Multi-Stage Fracture 3432.80 3432.90 0
2015-12-16 Multi-Stage Fracture 5100.80 5100.90 0
2015-12-16 Multi-Stage Fracture 5014.70 5014.80 0
2015-12-16 Multi-Stage Fracture 4915.00 4915.10 0
2015-12-16 Multi-Stage Fracture 4815.30 4815.40 0
2015-12-16 Multi-Stage Fracture 4729.10 4729.20 0
2015-12-16 Multi-Stage Fracture 4629.30 4629.40 0
2015-12-17 Multi-Stage Fracture 4543.20 4543.30 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-12-16 2015-12-19 3,255 10,920 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 83.4415 N/A
Prime Plus 30/50 Trican hexamethylenetetramine 100-97-0 100 3.0572 N/A
silica crystalline 14808-60-7 100 3.0572 N/A
Sand 30/50 Trican silica crystalline 14808-60-7 100 10.7586 N/A
Sand 50/140 Trican silica crystalline 14808-60-7 100 2.4256 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0108 N/A
dibromoacetonitrile 3252-43-5 100 0.0108 N/A
non-hazardous ingredients Not Available 100 0.0108 N/A
polyethylene glycol 25322-68-3 100 0.0108 N/A
sodium bromide 7647-15-6 100 0.0108 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.1809 N/A
water Not Available 100 0.1809 N/A
DF-2W Trican Defoamer non-hazardous ingredients Not Available 100 0.0085 N/A
propylene glycol 57-55-6 100 0.0085 N/A
GNE-2 Trican Demulsifier non-hazardous ingredients Not Available 100 0.0432 N/A
propylene glycol 57-55-6 100 0.0432 N/A
GFR-3D Trican Friction Reducer non-hazardous ingredients Not Available 100 0.0311 N/A
sodium chloride 7647-14-5 100 0.0311 N/A
SI-14 Trican Scale Inhibitor methanol 67-56-1 100 0.042 N/A
non-hazardous ingredients Not Available 100 0.042 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-12-17 2015-12-17 Recycled Fracturing Water (treated at well site) 9
2015-12-17 2015-12-17 Recycled Fracturing Water (treated at well site) 9
2015-12-17 2015-12-17 Recycled Fracturing Water (treated at well site) 9
2015-12-17 2015-12-17 Recycled Fracturing Water (treated at well site) 9
2015-12-15 2015-12-19 Central Water Distribution Facility 11329

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2016 4371 0.0 0.0 0.0
2017 5673 0.0 0.0 0.0
2018 7113 0.0 0.0 0.0
2019 7965 0.0 0.0 0.0
2020 2022 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-09-24 No Incident Encountered 0.00 0.00
2016-02-03 No Incident Encountered 0.00 0.00

For data sources see[10]

References