X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0596020113000

Well Details

Well ID: 0596020113000
Loading map...
Location: 00/13-01-059-02W6/0
Location Alias: 00/13-01-59-02 W6M
Location Alias 2: 00/13-01-059-02 W6/00
Country: Canada
Province: Alberta
Township: 059
Meridian: 6
Range: 02
Section: 01
County/Municipality: Municipal District of Greenview No. 16
Well Name: TOURMALINE HZ SMOKY 13-1-59-2
Operator Name: Tourmaline Oil Corp.
License Number: 0496523
License Date: 2019-11-21
License Status: Amended
Spud Date: 2020-01-12
Final Drill Date: 2020-02-13
Well Total Depth: 5122.00 m
Surface Hole Latitude: 54.071308
Surface Hole Longitude: -118.144114

For data sources see[1][2]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2020-02-05 Precision Drilling Corporation 531 Resumption
2020-01-12 Precision Drilling Corporation 531 Set Surface

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2020-02-07 2872.30 Deviate (5 - 79 degrees)
2020-02-09 3293.30 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2020-02-25 Multi-Stage Fracture 5070.20 5070.30 0
2020-02-26 Multi-Stage Fracture 4424.20 4424.30 0
2020-02-26 Multi-Stage Fracture 4371.70 4371.80 0
2020-02-26 Multi-Stage Fracture 4320.10 4320.20 0
2020-02-26 Multi-Stage Fracture 4268.00 4268.10 0
2020-02-26 Multi-Stage Fracture 4216.30 4216.40 0
2020-02-26 Multi-Stage Fracture 4164.30 4164.40 0
2020-02-26 Multi-Stage Fracture 4112.40 4112.50 0
2020-02-26 Multi-Stage Fracture 4060.00 4060.10 0
2020-02-26 Multi-Stage Fracture 4007.50 4007.60 0
2020-02-26 Multi-Stage Fracture 3955.30 3955.40 0
2020-02-25 Multi-Stage Fracture 5016.60 5016.70 0
2020-02-26 Multi-Stage Fracture 3903.50 3903.60 0
2020-02-26 Multi-Stage Fracture 3851.80 3851.90 0
2020-02-26 Multi-Stage Fracture 3800.00 3800.10 0
2020-02-26 Multi-Stage Fracture 3747.80 3747.90 0
2020-02-27 Multi-Stage Fracture 3695.30 3695.40 0
2020-02-27 Multi-Stage Fracture 3642.80 3642.90 0
2020-02-27 Multi-Stage Fracture 3590.80 3590.90 0
2020-02-27 Multi-Stage Fracture 3538.30 3538.40 0
2020-02-27 Multi-Stage Fracture 3486.20 3486.30 0
2020-02-27 Multi-Stage Fracture 3408.30 3408.40 0
2020-02-26 Multi-Stage Fracture 4965.00 4965.10 0
2020-02-27 Multi-Stage Fracture 3357.00 3357.10 0
2020-02-27 Multi-Stage Fracture 3305.40 3305.50 0
2020-02-27 Multi-Stage Fracture 3254.60 3254.70 0
2020-02-26 Multi-Stage Fracture 4912.60 4912.70 0
2020-02-26 Multi-Stage Fracture 4860.30 4860.40 0
2020-02-26 Multi-Stage Fracture 4808.40 4808.50 0
2020-02-26 Multi-Stage Fracture 4756.00 4756.10 0
2020-02-26 Multi-Stage Fracture 4703.80 4703.90 0
2020-02-26 Multi-Stage Fracture 4476.30 4476.40 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2020 148 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2020-01-12 Lost Circulation 53.00 88.00
2020-03-05 No Incident Encountered 0.00 0.00

For data sources see[7]

References