X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0596020112000

Well Details

Well ID: 0596020112000
Loading map...
Location: 00/12-01-059-02W6/0
Location Alias: 00/12-01-59-02 W6M
Location Alias 2: 00/12-01-059-02 W6/00
Country: Canada
Province: Alberta
Township: 059
Meridian: 6
Range: 02
Section: 01
County/Municipality: Municipal District of Greenview No. 16
Well Name: TOURMALINE HZ SMOKY 12-1-59-2
Operator Name: Tourmaline Oil Corp.
License Number: 0496522
License Date: 2019-11-21
License Status: Issued
Spud Date: 2020-01-10
Final Drill Date: 2020-02-02
Well Total Depth: 4900.00 m
Surface Hole Latitude: 54.071264
Surface Hole Longitude: -118.144109

For data sources see[1][2]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2020-01-10 Precision Drilling Corporation 531 Set Surface
2020-01-23 Precision Drilling Corporation 531 Resumption

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2020-01-25 2965.90 Deviate (5 - 79 degrees)
2020-01-26 3279.50 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2020-02-24 Multi-Stage Fracture 4854.80 4854.90 0
2020-02-24 Multi-Stage Fracture 4382.30 4382.40 0
2020-02-24 Multi-Stage Fracture 4329.90 4330.00 0
2020-02-24 Multi-Stage Fracture 4277.00 4277.10 0
2020-02-24 Multi-Stage Fracture 4225.00 4225.10 0
2020-02-24 Multi-Stage Fracture 4172.90 4173.00 0
2020-02-24 Multi-Stage Fracture 4120.00 4120.10 0
2020-02-25 Multi-Stage Fracture 4067.40 4067.50 0
2020-02-25 Multi-Stage Fracture 4014.50 4014.60 0
2020-02-25 Multi-Stage Fracture 3961.80 3961.90 0
2020-02-25 Multi-Stage Fracture 3909.00 3909.10 0
2020-02-24 Multi-Stage Fracture 4800.30 4800.40 0
2020-02-25 Multi-Stage Fracture 3856.30 3856.40 0
2020-02-25 Multi-Stage Fracture 3803.50 3803.60 0
2020-02-25 Multi-Stage Fracture 3751.80 3751.90 0
2020-02-25 Multi-Stage Fracture 3699.20 3699.30 0
2020-02-25 Multi-Stage Fracture 3646.70 3646.80 0
2020-02-25 Multi-Stage Fracture 3594.70 3594.80 0
2020-02-25 Multi-Stage Fracture 3542.20 3542.30 0
2020-02-25 Multi-Stage Fracture 3490.10 3490.20 0
2020-02-25 Multi-Stage Fracture 3437.80 3437.90 0
2020-02-25 Multi-Stage Fracture 3385.10 3385.20 0
2020-02-24 Multi-Stage Fracture 4747.70 4747.80 0
2020-02-25 Multi-Stage Fracture 3332.50 3332.60 0
2020-02-25 Multi-Stage Fracture 3279.90 3280.00 0
2020-02-25 Multi-Stage Fracture 3227.30 3227.40 0
2020-02-24 Multi-Stage Fracture 4695.00 4695.10 0
2020-02-24 Multi-Stage Fracture 4643.10 4643.20 0
2020-02-24 Multi-Stage Fracture 4590.90 4591.00 0
2020-02-24 Multi-Stage Fracture 4539.20 4539.30 0
2020-02-24 Multi-Stage Fracture 4486.70 4486.80 0
2020-02-24 Multi-Stage Fracture 4434.50 4434.60 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2020 783 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2020-02-02 No Incident Encountered 0.00 0.00
2020-03-05 No Incident Encountered 0.00 0.00

For data sources see[7]

References