If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0596020112000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.071264,"lon":-118.144109,"icon":""}]} |
Location: 00/12-01-059-02W6/0 | |
Location Alias: 00/12-01-59-02 W6M | |
Location Alias 2: 00/12-01-059-02 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 059 | |
Meridian: 6 | |
Range: 02 | |
Section: 01 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: TOURMALINE HZ SMOKY 12-1-59-2 | |
Operator Name: Tourmaline Oil Corp. | |
License Number: 0496522 | |
License Date: 2019-11-21 | |
License Status: Issued | |
Spud Date: 2020-01-10 | |
Final Drill Date: 2020-02-02 | |
Well Total Depth: 4900.00 m | |
Surface Hole Latitude: 54.071264 | |
Surface Hole Longitude: -118.144109 |
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2020-01-10 | Precision Drilling Corporation | 531 | Set Surface | |
2020-01-23 | Precision Drilling Corporation | 531 | Resumption |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2020-01-25 | 2965.90 | Deviate (5 - 79 degrees) |
2020-01-26 | 3279.50 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2020-02-24 | Multi-Stage Fracture | 4854.80 | 4854.90 | 0 |
2020-02-24 | Multi-Stage Fracture | 4382.30 | 4382.40 | 0 |
2020-02-24 | Multi-Stage Fracture | 4329.90 | 4330.00 | 0 |
2020-02-24 | Multi-Stage Fracture | 4277.00 | 4277.10 | 0 |
2020-02-24 | Multi-Stage Fracture | 4225.00 | 4225.10 | 0 |
2020-02-24 | Multi-Stage Fracture | 4172.90 | 4173.00 | 0 |
2020-02-24 | Multi-Stage Fracture | 4120.00 | 4120.10 | 0 |
2020-02-25 | Multi-Stage Fracture | 4067.40 | 4067.50 | 0 |
2020-02-25 | Multi-Stage Fracture | 4014.50 | 4014.60 | 0 |
2020-02-25 | Multi-Stage Fracture | 3961.80 | 3961.90 | 0 |
2020-02-25 | Multi-Stage Fracture | 3909.00 | 3909.10 | 0 |
2020-02-24 | Multi-Stage Fracture | 4800.30 | 4800.40 | 0 |
2020-02-25 | Multi-Stage Fracture | 3856.30 | 3856.40 | 0 |
2020-02-25 | Multi-Stage Fracture | 3803.50 | 3803.60 | 0 |
2020-02-25 | Multi-Stage Fracture | 3751.80 | 3751.90 | 0 |
2020-02-25 | Multi-Stage Fracture | 3699.20 | 3699.30 | 0 |
2020-02-25 | Multi-Stage Fracture | 3646.70 | 3646.80 | 0 |
2020-02-25 | Multi-Stage Fracture | 3594.70 | 3594.80 | 0 |
2020-02-25 | Multi-Stage Fracture | 3542.20 | 3542.30 | 0 |
2020-02-25 | Multi-Stage Fracture | 3490.10 | 3490.20 | 0 |
2020-02-25 | Multi-Stage Fracture | 3437.80 | 3437.90 | 0 |
2020-02-25 | Multi-Stage Fracture | 3385.10 | 3385.20 | 0 |
2020-02-24 | Multi-Stage Fracture | 4747.70 | 4747.80 | 0 |
2020-02-25 | Multi-Stage Fracture | 3332.50 | 3332.60 | 0 |
2020-02-25 | Multi-Stage Fracture | 3279.90 | 3280.00 | 0 |
2020-02-25 | Multi-Stage Fracture | 3227.30 | 3227.40 | 0 |
2020-02-24 | Multi-Stage Fracture | 4695.00 | 4695.10 | 0 |
2020-02-24 | Multi-Stage Fracture | 4643.10 | 4643.20 | 0 |
2020-02-24 | Multi-Stage Fracture | 4590.90 | 4591.00 | 0 |
2020-02-24 | Multi-Stage Fracture | 4539.20 | 4539.30 | 0 |
2020-02-24 | Multi-Stage Fracture | 4486.70 | 4486.80 | 0 |
2020-02-24 | Multi-Stage Fracture | 4434.50 | 4434.60 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2020 | 783 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2020-02-02 | No Incident Encountered | 0.00 | 0.00 |
2020-03-05 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]