If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0596011609000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.09644,"lon":-118.073323,"icon":""}]} |
Location: 00/09-16-059-01W6/0 | |
Location Alias: 00/09-16-59-01 W6M | |
Location Alias 2: 00/09-16-059-01 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 059 | |
Meridian: 6 | |
Range: 01 | |
Section: 16 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: CNRL 406785 WANYAN 9-16-59-1 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0406785 | |
License Date: 2008-12-19 | |
License Status: Amended | |
Spud Date: 2009-01-11 | |
Final Drill Date: 2009-02-07 | |
Well Total Depth: 3291.00 m | |
Surface Hole Latitude: 54.096440 | |
Surface Hole Longitude: -118.073323 |
Date | Event |
---|---|
2008-12-19 | Obtained License |
2009-01-11 | Lost Circulation Occurred |
2009-01-15 | Surface Casing Operation Performed |
2009-01-16 | Direction Drilling Operation Performed - Deviate |
2009-01-19 | Lost Circulation Occurred |
2009-02-07 | Finished Drilling |
2009-02-07 | Well Log Performed |
2009-02-07 | Well Mode changed to Drilled and Cased |
2009-02-08 | Well Log Performed |
2009-02-09 | Production Casing Operation Performed |
2009-02-11 | Rig Released |
2009-02-27 | Perforation Treatment Performed - Jet Perforation |
2009-02-27 | Well Log Performed |
2009-02-28 | Perforation Treatment Performed - Jet Perforation |
2009-02-28 | Well Log Performed |
2009-03-01 | Perforation Treatment Performed - Fractured |
2009-03-01 | Well Fluid changed to Gas |
2009-03-01 | Well Mode changed to Testing |
2009-03-03 | Perforation Treatment Performed - Jet Perforation |
2009-03-03 | Well Log Performed |
2009-03-05 | Perforation Treatment Performed - Fractured |
2009-03-07 | Perforation Treatment Performed - Jet Perforation |
2009-03-07 | Well Log Performed |
2009-03-08 | Perforation Treatment Performed - Fractured |
2009-03-08 | Perforation Treatment Performed - Jet Perforation |
2009-04-05 | Well Began Production |
2009-04-05 | Well Fluid changed to Gas |
2009-04-05 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2009-01-16 | 661.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2009-02-27 | Perforation | 3249.00 | 3250.00 | 3 |
2009-03-01 | Fracture | 3219.50 | 3220.50 | 0 |
2009-03-01 | Fracture | 3215.00 | 3216.00 | 0 |
2009-03-01 | Fracture | 3199.00 | 3200.00 | 0 |
2009-03-01 | Fracture | 3176.50 | 3178.50 | 0 |
2009-03-01 | Fracture | 3114.50 | 3116.50 | 0 |
2009-03-01 | Fracture | 3075.00 | 3076.00 | 0 |
2009-03-01 | Fracture | 3016.50 | 3017.50 | 0 |
2009-03-03 | Perforation | 3001.00 | 3002.00 | 6 |
2009-03-03 | Perforation | 2996.50 | 2997.50 | 6 |
2009-03-03 | Perforation | 2990.00 | 2992.00 | 6 |
2009-02-27 | Perforation | 3219.50 | 3220.50 | 3 |
2009-03-05 | Fracture | 3001.00 | 3002.00 | 0 |
2009-03-05 | Fracture | 2996.50 | 2997.50 | 0 |
2009-03-05 | Fracture | 2990.00 | 2992.00 | 0 |
2009-03-07 | Perforation | 2836.00 | 2837.00 | 6 |
2009-03-08 | Perforation | 2831.50 | 2832.50 | 6 |
2009-03-08 | Perforation | 2802.50 | 2803.50 | 6 |
2009-03-08 | Fracture | 2836.00 | 2837.00 | 0 |
2009-03-08 | Fracture | 2831.50 | 2832.50 | 0 |
2009-03-08 | Fracture | 2802.50 | 2803.50 | 0 |
2009-02-27 | Perforation | 3215.00 | 3216.00 | 3 |
2009-02-28 | Perforation | 3199.00 | 3200.00 | 3 |
2009-02-28 | Perforation | 3176.50 | 3178.50 | 3 |
2009-02-28 | Perforation | 3114.50 | 3116.50 | 3 |
2009-02-28 | Perforation | 3075.00 | 3076.00 | 3 |
2009-02-28 | Perforation | 3016.50 | 3017.50 | 3 |
2009-03-01 | Fracture | 3249.00 | 3250.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2009 | 4580 | 0.0 | 0.0 | 0.0 |
2010 | 6583 | 0.0 | 0.0 | 0.0 |
2011 | 8583 | 0.0 | 0.0 | 0.0 |
2012 | 8402 | 0.0 | 0.0 | 0.0 |
2013 | 8019 | 0.0 | 0.0 | 0.0 |
2014 | 8566 | 0.0 | 0.0 | 0.0 |
2015 | 8327 | 0.0 | 0.0 | 0.0 |
2016 | 8111 | 0.0 | 0.0 | 0.0 |
2017 | 8519 | 0.0 | 0.0 | 0.0 |
2018 | 7991 | 0.0 | 0.0 | 0.0 |
2019 | 8735 | 0.0 | 0.0 | 0.0 |
2020 | 2135 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2009-01-11 | Lost Circulation | 34.00 | 235.00 |
2009-01-19 | Lost Circulation | 1130.00 | 1160.00 |
For data sources see[7]