X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0596011411006

Well Details

Well ID: 0596011411006
Loading map...
Location: 00/11-14-059-01W6/6
Location Alias: 00/11-14-59-01 W6M
Location Alias 2: 00/11-14-059-01 W6/06
Country: Canada
Province: Alberta
Township: 059
Meridian: 6
Range: 01
Section: 14
County/Municipality: Municipal District of Greenview No. 16
Well Name: CNRL 406797 WANYAN 11-14-59-1
Operator Name: Canadian Natural Resources Limited
License Number: 0406797
License Date: 2008-12-19
License Status: Amended
Spud Date: 2009-01-12
Final Drill Date: 2009-01-29
Well Total Depth: 3133.00 m
Surface Hole Latitude: 54.103234
Surface Hole Longitude: -118.040917

For data sources see[1][2]

Well History

Date Event
2008-12-19 Obtained License
2009-01-12 Well Log Performed
2009-01-13 Lost Circulation Occurred
2009-01-17 Surface Casing Operation Performed
2009-01-29 Finished Drilling
2009-01-29 Well Mode changed to Drilled and Cased
2009-01-30 Well Log Performed
2009-01-31 Well Log Performed
2009-02-02 Production Casing Operation Performed
2009-02-06 Rig Released
2009-02-15 Well Log Performed
2009-02-23 Perforation Treatment Performed - Jet Perforation
2009-02-23 Well Log Performed
2009-02-24 Perforation Treatment Performed - Fractured
2009-02-26 Perforation Treatment Performed - Jet Perforation
2009-02-26 Well Log Performed
2009-02-27 Perforation Treatment Performed - Fractured
2009-03-01 Perforation Treatment Performed - Jet Perforation
2009-03-02 Perforation Treatment Performed - Jet Perforation
2009-03-02 Well Fluid changed to Gas
2009-03-02 Well Log Performed
2009-03-02 Well Mode changed to Testing
2009-03-03 Perforation Treatment Performed - Fractured
2009-04-02 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-02-23 Perforation 3035.00 3036.00 6
2009-02-27 Fracture 2815.00 2816.00 0
2009-03-01 Perforation 2652.00 2653.00 6
2009-03-01 Perforation 2665.00 2666.00 6
2009-03-01 Perforation 2669.00 2670.00 6
2009-03-02 Perforation 2605.00 2606.00 6
2009-03-02 Perforation 2636.00 2637.00 6
2009-03-03 Fracture 2636.00 2637.00 0
2009-03-03 Fracture 2605.00 2606.00 0
2009-03-03 Fracture 2669.00 2670.00 0
2009-03-03 Fracture 2665.00 2666.00 0
2009-02-23 Perforation 3012.00 3014.00 6
2009-03-03 Fracture 2652.00 2653.00 0
2009-02-23 Perforation 3038.00 3039.00 6
2009-02-23 Perforation 3105.00 3106.00 9
2009-02-24 Fracture 3012.00 3014.00 0
2009-02-24 Fracture 3035.00 3036.00 0
2009-02-24 Fracture 3105.00 3106.00 0
2009-02-24 Fracture 3038.00 3039.00 0
2009-02-26 Perforation 2815.00 2816.00 9

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 46 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2009-01-13 Lost Circulation 44.00 55.00

For data sources see[6]

References