X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0595270908000

Well Details

Well ID: 0595270908000
Loading map...
Location: 00/08-09-059-27W5/0
Location Alias: 00/08-09-59-27 W5M
Location Alias 2: 00/08-09-059-27 W5/00
Country: Canada
Province: Alberta
Township: 059
Meridian: 5
Range: 27
Section: 09
County/Municipality: Municipal District of Greenview No. 16
Well Name: CVE SMOKY 8-9-59-27
Operator Name: Cenovus Energy Inc.
License Number: 0413333
License Date: 2009-10-22
License Status: Issued
Spud Date: 2009-12-28
Final Drill Date: 2010-01-14
Well Total Depth: 3208.00 m
Surface Hole Latitude: 54.082986
Surface Hole Longitude: -117.982008

For data sources see[1][2]

Well History

Date Event
2009-10-22 Obtained License
2009-12-28 Lost Circulation Occurred
2009-12-29 Lost Circulation Occurred
2009-12-30 Lost Circulation Occurred
2010-01-02 Surface Casing Operation Performed
2010-01-07 Direction Drilling Operation Performed - Deviate
2010-01-14 Finished Drilling
2010-01-14 Well Log Performed
2010-01-14 Well Mode changed to Drilled and Cased
2010-01-16 Production Casing Operation Performed
2010-01-17 Rig Released
2010-02-03 Perforation Treatment Performed - Jet Perforation
2010-02-04 Perforation Treatment Performed - Fractured
2010-02-15 Perforation Treatment Performed - Jet Perforation
2010-02-16 Perforation Treatment Performed - Fractured
2010-02-17 Perforation Treatment Performed - Jet Perforation
2010-02-18 Perforation Treatment Performed - Fractured
2010-03-11 Well Began Production
2010-03-11 Well Fluid changed to Gas
2010-03-11 Well Mode changed to Flowing
2015-05-14 Well Fluid changed to Gas
2015-05-14 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-01-07 1705.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-02-03 Perforation 3086.50 3087.50 20
2010-02-18 Fracture 2709.50 2757.00 0
2010-02-03 Perforation 3122.00 3124.00 20
2010-02-04 Fracture 3086.50 3124.00 0
2010-02-15 Perforation 2916.00 2919.00 20
2010-02-16 Fracture 2916.00 2919.00 0
2010-02-17 Perforation 2755.00 2757.00 13
2010-02-17 Perforation 2746.50 2747.50 13
2010-02-17 Perforation 2740.50 2741.50 13
2010-02-17 Perforation 2709.50 2710.50 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 6704 0.0 0.0 0.0
2011 8483 0.0 0.0 0.0
2012 8223 0.0 0.0 0.0
2013 8016 0.0 0.0 0.0
2014 6791 0.0 0.0 0.0
2015 5568 0.0 0.0 0.0
2016 6791 0.0 0.0 0.0
2017 8255 0.0 0.0 0.0
2018 8231 0.0 0.0 0.0
2019 8664 0.0 0.0 0.0
2020 2135 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2009-12-28 Lost Circulation 25.00 25.00
2009-12-28 Lost Circulation 122.00 122.00
2009-12-29 Lost Circulation 135.00 135.00
2009-12-30 Lost Circulation 442.00 442.00

For data sources see[7]

References