X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0595261513000

Well Details

Well ID: 0595261513000
Loading map...
Location: 00/13-15-059-26W5/0
Location Alias: 00/13-15-59-26 W5M
Location Alias 2: 00/13-15-059-26 W5/00
Country: Canada
Province: Alberta
Township: 059
Meridian: 5
Range: 26
Section: 15
County/Municipality: Municipal District of Greenview No. 16
Well Name: XTO HZ LELAND 13-15-59-26
Operator Name: XTO Energy Canada ULC
License Number: 0462793
License Date: 2013-12-20
License Status: Issued
Spud Date: 2014-01-17
Final Drill Date: 2014-03-11
Well Total Depth: 5275.00 m
Surface Hole Latitude: 54.088392
Surface Hole Longitude: -117.826324

For data sources see[1][2]

Well History

Date Event
2013-12-20 Obtained License
2014-01-19 Surface Casing Operation Performed
2014-02-03 Direction Drilling Operation Performed - Deviate
2014-02-14 Direction Drilling Operation Performed - Horizontal
2014-02-16 Well Log Performed
2014-02-19 Intermediate Casing Operation Performed
2014-02-25 Well Log Performed
2014-03-11 Finished Drilling
2014-03-11 Well Log Performed
2014-03-11 Well Mode changed to Drilled and Cased
2014-03-14 Well Log Performed
2014-03-16 Production Casing Operation Performed
2014-03-17 Rig Released
2015-01-30 Perforation Treatment Performed - Jet Perforation
2015-02-14 Perforation Treatment Performed - Fractured
2015-02-14 Perforation Treatment Performed - Jet Perforation
2015-02-15 Perforation Treatment Performed - Fractured
2015-02-15 Perforation Treatment Performed - Jet Perforation
2015-02-16 Perforation Treatment Performed - Fractured
2015-02-16 Perforation Treatment Performed - Jet Perforation
2015-02-17 Perforation Treatment Performed - Fractured
2015-02-17 Well Log Performed
2015-02-20 Perforation Treatment Performed - Jet Perforation
2015-02-21 Perforation Treatment Performed - Fractured
2015-02-21 Perforation Treatment Performed - Jet Perforation
2015-02-22 Perforation Treatment Performed - Fractured
2015-02-22 Perforation Treatment Performed - Jet Perforation
2015-02-23 Perforation Treatment Performed - Fractured
2015-02-23 Perforation Treatment Performed - Jet Perforation
2015-03-01 Well Fluid changed to Gas
2015-03-01 Well Mode changed to Testing
2015-06-30 Well Fluid changed to Gas
2015-06-30 Well Mode changed to Test Completed
2015-07-01 Well Began Production
2015-07-01 Well Fluid changed to Gas
2015-07-01 Well Mode changed to Flowing
2016-11-01 Well Fluid changed to Gas
2016-11-01 Well Mode changed to Suspended
2017-04-10 Well Fluid changed to Gas
2017-04-10 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-01-17 Precision Drilling Corporation 520 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-02-03 2993.00 Deviate (5 - 79 degrees)
2014-02-14 3263.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-01-30 Perforation 5222.50 5223.00 20
2015-02-14 Perforation 5059.00 5059.50 20
2015-02-22 Perforation 3537.00 3537.50 20
2015-02-22 Fracture 3537.00 3619.50 0
2015-02-22 Perforation 3517.50 3518.00 20
2015-02-22 Perforation 3497.00 3497.50 20
2015-02-22 Perforation 3476.50 3477.00 20
2015-02-22 Perforation 3456.00 3456.50 20
2015-02-22 Perforation 3435.50 3436.00 20
2015-02-23 Fracture 3435.50 3518.00 0
2015-02-23 Perforation 3416.00 3416.50 20
2015-02-23 Perforation 3395.50 3396.00 20
2015-02-14 Fracture 5059.00 5142.00 0
2015-02-23 Perforation 3375.00 3375.50 20
2015-02-23 Perforation 3354.50 3355.00 20
2015-02-23 Perforation 3334.00 3334.50 20
2015-02-23 Fracture 3334.00 3416.50 0
2015-02-23 Perforation 3314.50 3315.00 20
2015-02-23 Perforation 3294.00 3294.50 20
2015-02-23 Perforation 3273.50 3274.00 20
2015-02-23 Perforation 3253.00 3253.50 20
2015-02-23 Perforation 3232.50 3233.00 20
2015-02-23 Fracture 3232.50 3315.00 0
2015-02-14 Perforation 5040.00 5040.50 20
2015-02-14 Perforation 5019.50 5020.00 20
2015-02-14 Perforation 4999.00 4999.50 20
2015-02-14 Perforation 4978.50 4979.00 20
2015-02-14 Perforation 4958.00 4958.50 20
2015-02-15 Fracture 4958.00 5040.50 0
2015-02-15 Perforation 4938.50 4939.00 20
2015-02-15 Perforation 4918.00 4918.50 20
2015-01-30 Perforation 5202.00 5202.50 20
2015-02-15 Perforation 4897.50 4898.00 20
2015-02-15 Perforation 4877.00 4877.50 20
2015-02-15 Perforation 4856.50 4857.00 20
2015-02-15 Fracture 4856.50 4939.00 0
2015-02-15 Perforation 4837.00 4837.50 20
2015-02-15 Perforation 4816.50 4817.00 20
2015-02-15 Perforation 4796.00 4796.50 20
2015-02-15 Perforation 4775.50 4776.00 20
2015-02-15 Perforation 4755.00 4755.50 20
2015-02-15 Fracture 4755.00 4837.50 0
2015-01-30 Perforation 5181.50 5182.00 20
2015-02-15 Perforation 4735.50 4736.00 20
2015-02-15 Perforation 4715.00 4715.50 20
2015-02-15 Perforation 4694.50 4695.00 20
2015-02-15 Perforation 4674.00 4674.50 20
2015-02-15 Perforation 4653.50 4654.00 20
2015-02-16 Fracture 4653.50 4736.00 0
2015-02-16 Perforation 4634.00 4634.50 20
2015-02-16 Perforation 4613.50 4614.00 20
2015-02-16 Perforation 4593.00 4593.50 20
2015-02-16 Perforation 4573.50 4574.00 20
2015-01-30 Perforation 5161.00 5161.50 20
2015-02-16 Perforation 4552.00 4552.50 20
2015-02-16 Fracture 4552.00 4634.50 0
2015-02-16 Perforation 4532.50 4533.00 20
2015-02-16 Perforation 4512.00 4512.50 20
2015-02-16 Perforation 4491.50 4492.00 20
2015-02-16 Perforation 4471.00 4471.50 20
2015-02-16 Perforation 4450.50 4451.00 20
2015-02-16 Fracture 4450.50 4533.00 0
2015-02-16 Perforation 4431.00 4431.50 20
2015-02-16 Perforation 4410.50 4411.00 20
2015-02-14 Fracture 5161.00 5223.00 0
2015-02-16 Perforation 4390.00 4390.50 20
2015-02-16 Perforation 4369.50 4370.00 20
2015-02-16 Perforation 4349.00 4349.50 20
2015-02-17 Fracture 4349.00 4431.50 0
2015-02-20 Perforation 4329.50 4330.00 20
2015-02-20 Perforation 4309.00 4309.50 20
2015-02-20 Perforation 4288.50 4289.00 20
2015-02-20 Perforation 4268.00 4268.50 20
2015-02-20 Perforation 4247.50 4248.00 20
2015-02-21 Fracture 4247.50 4330.00 0
2015-02-14 Perforation 5141.50 5142.00 20
2015-02-21 Perforation 4228.00 4228.50 20
2015-02-21 Perforation 4207.50 4208.00 20
2015-02-21 Perforation 4187.00 4187.50 20
2015-02-21 Perforation 4166.00 4166.50 20
2015-02-21 Perforation 4146.00 4146.50 20
2015-02-21 Fracture 4146.00 4228.50 0
2015-02-21 Perforation 4126.00 4126.50 20
2015-02-21 Perforation 4106.00 4106.50 20
2015-02-21 Perforation 4085.50 4086.00 20
2015-02-21 Perforation 4065.00 4065.50 20
2015-02-14 Perforation 5121.00 5121.50 20
2015-02-21 Perforation 4044.00 4044.50 20
2015-02-21 Fracture 4044.00 4126.50 0
2015-02-21 Perforation 4025.00 4025.50 20
2015-02-21 Perforation 4004.50 4005.00 20
2015-02-21 Perforation 3984.00 3984.50 20
2015-02-21 Perforation 3963.50 3964.00 20
2015-02-21 Perforation 3943.00 3943.50 20
2015-02-21 Fracture 3943.00 4025.50 0
2015-02-21 Perforation 3923.50 3924.00 20
2015-02-21 Perforation 3903.00 3903.50 20
2015-02-14 Perforation 5100.50 5101.00 20
2015-02-21 Perforation 3882.50 3883.00 20
2015-02-21 Perforation 3862.00 3862.50 20
2015-02-21 Perforation 3841.50 3842.00 20
2015-02-22 Fracture 3841.50 3924.00 0
2015-02-22 Perforation 3822.00 3822.50 20
2015-02-22 Perforation 3801.50 3802.00 20
2015-02-22 Perforation 3781.00 3781.50 20
2015-02-22 Perforation 3760.00 3760.50 20
2015-02-22 Perforation 3740.00 3740.50 20
2015-02-22 Fracture 3740.00 3822.50 0
2015-02-14 Perforation 5080.00 5080.50 20
2015-02-22 Perforation 3720.50 3721.00 20
2015-02-22 Perforation 3700.00 3700.50 20
2015-02-22 Perforation 3679.50 3680.00 20
2015-02-22 Perforation 3659.00 3659.50 20
2015-02-22 Perforation 3638.50 3639.00 20
2015-02-22 Fracture 3638.50 3721.00 0
2015-02-22 Perforation 3619.00 3619.50 20
2015-02-22 Perforation 3598.50 3599.00 20
2015-02-22 Perforation 3578.00 3578.50 20
2015-02-22 Perforation 3557.50 3558.00 20

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-02-14 2015-02-23 3,201 16,304 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 77.8343 N/A
Atlas CRC-C (30/50) Canyon Crystalline silica. quartz 14808-60-7 100 1.9342 N/A
Hexamethylenetetramine 100-97-0 100 1.9342 N/A
Phenol formaldehyde resin 9003-35-4 100 1.9342 N/A
Sand (40/70) Ottawa Canyon Aluminum Oxide 1344-28-1 100 16.7633 N/A
Crystalline silica. quartz 14808-60-7 100 16.7633 N/A
Iron Oxide 1309-37-1 100 16.7633 N/A
Titanium Oxide 13463-67-7 100 16.7633 N/A
Sand (50/140) Canyon Aluminum Oxide 1344-28-1 100 0.6447 N/A
Crystalline silica. quartz 14808-60-7 100 0.6447 N/A
Iron Oxide 1309-37-1 100 0.6447 N/A
Titanium Oxide 13463-67-7 100 0.6447 N/A
HCL 15% Canyon Acid Hydrogen Chloride 7647-01-0 100 2.556 N/A
Water 7732-18-5 100 2.556 N/A
Tolcide PS75LT Canyon Bactericide/Biocide Tetrakis (Hydroxymethyl) Phosphonium Sulfate 55566-30-8 100 0.011 N/A
Water 7732-18-5 100 0.011 N/A
CAN-1000 Corrosion Inhibitor Canyon Corrosion Inhibitor Refer to MSDS 8141 100 0.0065 N/A
CAN-1203 Anti-Sludge Agent / Non-Emulsifier Canyon Demulsifier Refer to MSDS 8253 100 0.0039 N/A
CAN-2057 Friction Reducer Canyon Gelling Agent No hazardous ingredients Not Available 100 0.1155 N/A
CAN-1101 Iron Control Reduction Canyon Iron Control 2-Mercaptoethanol 60-24-2 100 0.0064 N/A
Cupric Chloride 7447-39-4 100 0.0064 N/A
Monoethanolamine 141-43-5 100 0.0064 N/A
CAN-1202 Acid Wetting Agent Canyon Surfactant 1-Methoxy-2-Propanol 107-98-2 100 0.003 N/A
Water 7732-18-5 100 0.003 N/A
CAN-2403 nanoFLO Canyon Surfactant Ethanol 64-17-5 100 0.1206 N/A
Methanol 67-56-1 100 0.1206 N/A
Terpenes and Terpenoids. sweet orange-oil 68647-72-3 100 0.1206 N/A
Water 7732-18-5 100 0.1206 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-02-03 2015-02-23 Surface Water - Lake 17943
2015-02-21 2015-02-25 Surface Water - River 1736

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 743 0.0 0.0 0.0
2017 806 0.0 0.0 0.0
2018 4869 0.0 0.0 0.0
2019 128 0.0 0.0 0.0
2020 1235 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-03-17 No Incident Encountered 0.00 0.00
2015-03-02 No Incident Encountered 0.00 0.00

For data sources see[10]

References