If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0595261402000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.08611,"lon":-117.779899,"icon":""}]} |
Location: 00/02-14-059-26W5/0 | |
Location Alias: 00/02-14-59-26 W5M | |
Location Alias 2: 00/02-14-059-26 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 059 | |
Meridian: 5 | |
Range: 26 | |
Section: 14 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: TOURMALINE LELAND 2-14-59-26 | |
Operator Name: Tourmaline Oil Corp. | |
License Number: 0425992 | |
License Date: 2010-11-18 | |
License Status: Issued | |
Spud Date: 2011-01-19 | |
Final Drill Date: 2011-02-20 | |
Well Total Depth: 4146.00 m | |
Surface Hole Latitude: 54.086110 | |
Surface Hole Longitude: -117.779899 |
Date | Event |
---|---|
2010-11-18 | Obtained License |
2011-01-23 | Surface Casing Operation Performed |
2011-01-31 | Well Log Performed |
2011-02-02 | Direction Drilling Operation Performed - Horizontal |
2011-02-11 | Intermediate Casing Operation Performed |
2011-02-20 | Finished Drilling |
2011-02-20 | Liner Casing Operation Performed |
2011-02-20 | Perforation Treatment Performed - Open-Hole Completion |
2011-02-20 | Well Mode changed to Drilled and Cased |
2011-02-24 | Rig Released |
2011-03-06 | Well Log Performed |
2011-03-13 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-03-14 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-03-15 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-03-17 | Well Fluid changed to Gas |
2011-03-17 | Well Mode changed to Testing |
2011-03-24 | Well Began Production |
2011-03-24 | Well Fluid changed to Gas |
2011-03-24 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-02-02 | 2567.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-02-20 | Open Hole/Barefoot Completion | 4131.30 | 4146.00 | 0 |
2011-03-15 | Multi-Stage Fracture | 3245.80 | 3247.10 | 0 |
2011-03-15 | Multi-Stage Fracture | 3110.60 | 3111.80 | 0 |
2011-03-13 | Multi-Stage Fracture | 4064.40 | 4069.60 | 0 |
2011-03-13 | Multi-Stage Fracture | 3976.60 | 3977.90 | 0 |
2011-03-13 | Multi-Stage Fracture | 3879.30 | 3880.50 | 0 |
2011-03-13 | Multi-Stage Fracture | 3769.20 | 3770.40 | 0 |
2011-03-13 | Multi-Stage Fracture | 3674.10 | 3675.30 | 0 |
2011-03-14 | Multi-Stage Fracture | 3577.00 | 3578.20 | 0 |
2011-03-15 | Multi-Stage Fracture | 3467.60 | 3468.80 | 0 |
2011-03-15 | Multi-Stage Fracture | 3356.80 | 3358.10 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 3940 | 0.0 | 0.0 | 0.0 |
2012 | 8593 | 0.0 | 0.0 | 0.0 |
2013 | 8295 | 0.0 | 0.0 | 0.0 |
2014 | 8549 | 0.0 | 0.0 | 0.0 |
2015 | 8602 | 0.0 | 0.0 | 0.0 |
2016 | 7043 | 0.0 | 0.0 | 0.0 |
2017 | 6987 | 0.0 | 0.0 | 0.0 |
2018 | 8528 | 0.0 | 0.0 | 0.0 |
2019 | 5531 | 0.0 | 0.0 | 0.0 |
2020 | 1920 | 0.0 | 0.0 | 0.0 |
For data sources see[6]