X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0595232508000

Well Details

Well ID: 0595232508000
Loading map...
Location: 00/08-25-059-23W5/0
Location Alias: 00/08-25-59-23 W5M
Location Alias 2: 00/08-25-059-23 W5/00
Country: Canada
Province: Alberta
Township: 059
Meridian: 5
Range: 23
Section: 25
County/Municipality: Municipal District of Greenview No. 16
Well Name: MAPAN ENERGY BERLR 8-25-59-23
Operator Name: Tourmaline Oil Corp.
License Number: 0224592
License Date: 1999-07-20
License Status: Issued
Spud Date: 1999-08-22
Final Drill Date: 1999-09-05
Well Total Depth: 2800.00 m
Surface Hole Latitude: 54.126875
Surface Hole Longitude: -117.306879

For data sources see[1][2]

Well History

Date Event
1999-07-20 Obtained License
1999-08-24 Surface Casing Operation Performed
1999-09-05 Finished Drilling
1999-09-05 Well Log Performed
1999-09-06 Well Log Performed
1999-09-08 Drill Stem Test Performed
1999-09-10 Production Casing Operation Performed
1999-09-10 Rig Released
1999-09-10 Well Mode changed to Drilled and Cased
1999-09-16 Perforation Treatment Performed - Jet Perforation
1999-09-16 Well Log Performed
1999-09-18 Perforation Treatment Performed - Fractured
1999-09-21 Well Log Performed
1999-09-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-09-22 Plug Back Performed
1999-09-22 Well Log Performed
2003-06-09 Perforation Treatment Performed - Jet Perforation
2003-06-10 Perforation Treatment Performed - Cement Squeeze
2003-06-10 Plug Back Performed
2003-06-13 Perforation Treatment Performed - Jet Perforation
2003-06-16 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1999-09-16 Perforation 2385.00 2386.00 17
1999-09-18 Fracture 2385.00 2386.00 0
1999-09-22 Packing Device Capped w/Cement 2372.00 2380.00 0
2003-06-09 Perforation 2385.00 2386.00 17
2003-06-10 Cement Squeeze 2385.00 2386.00 0
2003-06-13 Perforation 2775.00 2781.00 17
2003-06-16 Fracture 2775.00 2781.00 0

For data sources see[4]



References