X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0595232006000

Well Details

Well ID: 0595232006000
Loading map...
Location: 00/06-20-059-23W5/0
Location Alias: 00/06-20-59-23 W5M
Location Alias 2: 00/06-20-059-23 W5/00
Country: Canada
Province: Alberta
Township: 059
Meridian: 5
Range: 23
Section: 20
County/Municipality: Municipal District of Greenview No. 16
Well Name: MAPAN ENERGY BERLR 6-20-59-23
Operator Name: Tourmaline Oil Corp.
License Number: 0363914
License Date: 2006-10-03
License Status: Suspension
Spud Date: 2006-10-29
Final Drill Date: 2006-11-15
Well Total Depth: 2915.00 m
Surface Hole Latitude: 54.113571
Surface Hole Longitude: -117.415212

For data sources see[1][2]

Well History

Date Event
2006-10-03 Obtained License
2006-11-01 Surface Casing Operation Performed
2006-11-15 Finished Drilling
2006-11-15 Well Log Performed
2006-11-15 Well Mode changed to Drilled and Cased
2006-11-17 Production Casing Operation Performed
2006-11-18 Rig Released
2006-12-16 Perforation Treatment Performed - Jet Perforation
2006-12-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-01-04 Perforation Treatment Performed - Jet Perforation
2007-01-07 Perforation Treatment Performed - Fractured
2007-01-09 Perforation Treatment Performed - Jet Perforation
2007-01-11 Perforation Treatment Performed - Fractured
2007-01-13 Perforation Treatment Performed - Jet Perforation
2007-01-14 Perforation Treatment Performed - Fractured
2007-11-07 Well Fluid changed to Gas
2007-11-07 Well Mode changed to Testing
2007-11-13 Well Fluid changed to Gas
2007-11-13 Well Mode changed to Test Completed
2019-12-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-12-02 Plug Back Performed
2019-12-02 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2006-12-16 Perforation 2871.50 2874.00 17
2007-01-13 Perforation 2326.00 2329.50 17
2007-01-14 Fracture 2326.00 2329.50 0
2019-12-02 Packing Device Capped w/Cement 2312.00 2320.00 0
2006-12-18 Packing Device Capped w/Cement 2852.00 2860.00 0
2007-01-04 Perforation 2764.00 2767.00 17
2007-01-07 Fracture 2764.00 2767.00 0
2007-01-09 Perforation 2711.50 2712.50 3
2007-01-09 Perforation 2652.00 2653.00 3
2007-01-09 Perforation 2521.00 2522.00 3
2007-01-09 Perforation 2478.00 2479.00 3
2007-01-11 Fracture 2478.00 2712.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2007 115 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-12-03 No Incident Encountered 0.00 0.00

For data sources see[6]

References