X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0595231810020

Well Details

Well ID: 0595231810020
Loading map...
Location: 02/10-18-059-23W5/0
Location Alias: 02/10-18-59-23 W5M
Location Alias 2: 02/10-18-059-23 W5/00
Country: Canada
Province: Alberta
Township: 059
Meridian: 5
Range: 23
Section: 18
County/Municipality: Municipal District of Greenview No. 16
Well Name: EMC 102 BERLR 10-18-59-23
Operator Name: Husky Oil Operations Limited
License Number: 0272138
License Date: 2002-07-25
License Status: Abandoned
Spud Date: 2003-01-12
Final Drill Date: 2003-01-31
Well Total Depth: 2975.00 m
Surface Hole Latitude: 54.103302
Surface Hole Longitude: -117.437343

For data sources see[1][2]

Well History

Date Event
2002-07-25 Obtained License
2003-01-14 Surface Casing Operation Performed
2003-01-25 Direction Drilling Operation Performed - Deviate
2003-01-31 Finished Drilling
2003-01-31 Well Mode changed to Drilled and Cased
2003-02-01 Well Log Performed
2003-02-02 Well Log Performed
2003-02-03 Production Casing Operation Performed
2003-02-04 Rig Released
2003-03-04 Perforation Treatment Performed - Jet Perforation
2003-03-12 Well Fluid changed to Gas
2003-03-12 Well Mode changed to Testing
2003-03-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-03-26 Plug Back Performed
2003-03-26 Well Fluid changed to Gas
2003-03-26 Well Mode changed to Abandoned Zone
2003-03-27 Perforation Treatment Performed - Jet Perforation
2003-03-29 Perforation Treatment Performed - Fractured
2014-11-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-11-03 Plug Back Performed
2014-11-03 Well Log Performed
2014-11-08 Perforation Treatment Performed - Jet Perforation
2014-11-08 Well Log Performed
2014-11-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-11-09 Perforation Treatment Performed - Cement Plug
2014-11-09 Perforation Treatment Performed - Remedial Casing
2014-11-09 Plug Back Performed
2014-11-12 Perforation Treatment Performed - Jet Perforation
2014-11-12 Well Log Performed
2014-11-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-11-13 Perforation Treatment Performed - Remedial Casing
2014-11-13 Plug Back Performed
2014-12-15 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2003-01-25 2606.40 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2003-03-04 Perforation 2933.00 2936.00 17
2014-11-09 Packing Device Capped w/Cement 932.50 942.00 0
2014-11-12 Perforation 774.00 777.00 17
2014-11-12 Perforation 725.00 727.00 17
2014-11-13 Remedial Casing Cementing 774.00 777.00 0
2014-11-13 Packing Device Capped w/Cement 686.90 773.00 0
2003-03-26 Packing Device Capped w/Cement 2917.00 2925.00 0
2003-03-27 Perforation 2899.00 2901.00 17
2003-03-29 Fracture 2899.00 2901.00 0
2014-11-03 Packing Device Capped w/Cement 2884.00 2892.00 0
2014-11-08 Perforation 943.00 945.00 17
2014-11-08 Perforation 817.00 819.00 17
2014-11-09 Cement Plug 800.80 835.50 0
2014-11-09 Remedial Casing Cementing 943.00 945.00 0

For data sources see[5]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-11-22 No Incident Encountered 0.00 0.00

For data sources see[6]

References