X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0595231014020

Well Details

Well ID: 0595231014020
Loading map...
Location: 02/14-10-059-23W5/0
Location Alias: 02/14-10-59-23 W5M
Location Alias 2: 02/14-10-059-23 W5/00
Country: Canada
Province: Alberta
Township: 059
Meridian: 5
Range: 23
Section: 10
County/Municipality: Municipal District of Greenview No. 16
Well Name: DELPHI HZ BERLR 14-10-59-23
Operator Name: Delphi Energy Corp.
License Number: 0485974
License Date: 2017-10-23
License Status: Issued
Spud Date: 2017-11-14
Final Drill Date: 2017-12-10
Well Total Depth: 5931.00 m
Surface Hole Latitude: 54.064387
Surface Hole Longitude: -117.371173

For data sources see[1][2]

Well History

Date Event
2017-10-23 Obtained License
2017-11-14 Lost Circulation Occurred
2017-11-19 Surface Casing Operation Performed
2017-11-21 Direction Drilling Operation Performed - Deviate
2017-11-26 Direction Drilling Operation Performed - Horizontal
2017-11-28 Intermediate Casing Operation Performed
2017-12-10 Finished Drilling
2017-12-10 Well Log Performed
2017-12-10 Well Mode changed to Drilled and Cased
2017-12-14 Plug Back Performed
2017-12-14 Production Casing Operation Performed
2017-12-14 Rig Released
2018-01-13 Perforation Treatment Performed - Multi-Stage Fracture
2018-01-14 Perforation Treatment Performed - Multi-Stage Fracture
2018-01-15 Perforation Treatment Performed - Multi-Stage Fracture
2018-01-16 Perforation Treatment Performed - Multi-Stage Fracture
2018-01-18 Perforation Treatment Performed - Multi-Stage Fracture
2018-01-19 Perforation Treatment Performed - Multi-Stage Fracture
2018-01-20 Perforation Treatment Performed - Multi-Stage Fracture
2018-01-21 Perforation Treatment Performed - Multi-Stage Fracture
2018-01-22 Perforation Treatment Performed - Multi-Stage Fracture
2018-01-23 Perforation Treatment Performed - Multi-Stage Fracture
2018-01-29 Well Began Production
2018-01-29 Well Fluid changed to Gas
2018-01-29 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-11-14 Ensign Drilling Inc. 225 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-11-21 2051.40 Deviate (5 - 79 degrees)
2017-11-26 3026.20 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-01-13 Multi-Stage Fracture 5878.60 5878.70 0
2018-01-15 Multi-Stage Fracture 5352.70 5352.80 0
2018-01-15 Multi-Stage Fracture 5294.40 5294.50 0
2018-01-15 Multi-Stage Fracture 5235.30 5235.40 0
2018-01-16 Multi-Stage Fracture 5176.00 5176.10 0
2018-01-16 Multi-Stage Fracture 5116.80 5116.90 0
2018-01-18 Multi-Stage Fracture 5057.20 5057.30 0
2018-01-18 Multi-Stage Fracture 4997.90 4998.00 0
2018-01-19 Multi-Stage Fracture 4938.30 4938.40 0
2018-01-19 Multi-Stage Fracture 4879.20 4879.30 0
2018-01-19 Multi-Stage Fracture 4820.60 4820.70 0
2018-01-14 Multi-Stage Fracture 5826.70 5826.80 0
2018-01-19 Multi-Stage Fracture 4761.80 4761.90 0
2018-01-19 Multi-Stage Fracture 4703.30 4703.40 0
2018-01-19 Multi-Stage Fracture 4644.20 4644.30 0
2018-01-19 Multi-Stage Fracture 4585.70 4585.80 0
2018-01-20 Multi-Stage Fracture 4526.90 4527.00 0
2018-01-20 Multi-Stage Fracture 4468.90 4469.00 0
2018-01-20 Multi-Stage Fracture 4410.00 4410.10 0
2018-01-20 Multi-Stage Fracture 4351.20 4351.30 0
2018-01-20 Multi-Stage Fracture 4292.50 4292.60 0
2018-01-21 Multi-Stage Fracture 4233.70 4233.80 0
2018-01-14 Multi-Stage Fracture 5767.50 5767.60 0
2018-01-21 Multi-Stage Fracture 4175.30 4175.40 0
2018-01-21 Multi-Stage Fracture 4117.10 4117.20 0
2018-01-21 Multi-Stage Fracture 4058.50 4058.60 0
2018-01-21 Multi-Stage Fracture 4000.40 4000.50 0
2018-01-21 Multi-Stage Fracture 3942.00 3942.10 0
2018-01-22 Multi-Stage Fracture 3882.40 3882.50 0
2018-01-22 Multi-Stage Fracture 3823.00 3823.10 0
2018-01-22 Multi-Stage Fracture 3763.20 3763.30 0
2018-01-22 Multi-Stage Fracture 3703.40 3703.50 0
2018-01-22 Multi-Stage Fracture 3644.10 3644.20 0
2018-01-14 Multi-Stage Fracture 5708.00 5708.10 0
2018-01-22 Multi-Stage Fracture 3585.60 3585.70 0
2018-01-22 Multi-Stage Fracture 3526.00 3526.10 0
2018-01-22 Multi-Stage Fracture 3466.50 3466.60 0
2018-01-23 Multi-Stage Fracture 3407.30 3407.40 0
2018-01-23 Multi-Stage Fracture 3359.00 3359.10 0
2018-01-23 Multi-Stage Fracture 3311.30 3311.40 0
2018-01-23 Multi-Stage Fracture 3273.30 3273.40 0
2018-01-23 Multi-Stage Fracture 3233.50 3233.60 0
2018-01-23 Multi-Stage Fracture 3193.60 3193.70 0
2018-01-23 Multi-Stage Fracture 3154.30 3154.40 0
2018-01-14 Multi-Stage Fracture 5648.50 5648.60 0
2018-01-23 Multi-Stage Fracture 3114.60 3114.70 0
2018-01-14 Multi-Stage Fracture 5589.50 5589.60 0
2018-01-15 Multi-Stage Fracture 5530.20 5530.30 0
2018-01-15 Multi-Stage Fracture 5470.70 5470.80 0
2018-01-15 Multi-Stage Fracture 5411.70 5411.80 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-01-13 2018-01-23 2,863 17,574 N/A
2 2018-01-14 2018-01-23 2,863 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 N2 7727-37-9 100 1.6696 N/A
water Not Available 100 78.1616 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 5.7867 N/A
Sand 50/140 Trican silica crystalline 14808-60-7 100 5.4131 N/A
CC-8 Trican Clay Control choline chloride 67-48-1 100 0.0859 N/A
non-hazardous ingredients Not Available 100 0.0859 N/A
TriVert 1000 Trican Diverting Agent non-hazardous ingredients Not Available 100 0.0057 N/A
GFR-5D Trican Friction Reducer anionic polyacrylamide Not Available 100 0.0273 N/A
NMR-1 Trican Surfactant methanol 67-56-1 100 0.0164 N/A
non-hazardous ingredients Not Available 100 0.0164 N/A
2 Sand 30/50 Trican silica crystalline 14808-60-7 100 9.9394 N/A
WBO-2 Trican Breaker sodium persulfate 7775-27-1 100 0.0038 N/A
PFC-3 Trican Surfactant aminofunctional polymer 10352 100 0.0355 N/A
glycol ether 10352 100 0.0355 N/A
petroleum distillates 10352 100 0.0355 N/A
silicon compound 10352 100 0.0355 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-01-09 2018-01-15 Surface Water - River 17574

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 7821 0.0 0.0 0.0
2019 8068 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-11-14 Lost Circulation 87.00 163.00
2018-01-31 No Incident Encountered 0.00 0.00

For data sources see[10]

References