X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0595223416000

Well Details

Well ID: 0595223416000
Loading map...
Location: 00/16-34-059-22W5/0
Location Alias: 00/16-34-59-22 W5M
Location Alias 2: 00/16-34-059-22 W5/00
Country: Canada
Province: Alberta
Township: 059
Meridian: 5
Range: 22
Section: 34
County/Municipality: Municipal District of Greenview No. 16
Well Name: TRIOIL ET AL FIR 16-34-59-22
Operator Name: ORLEN Upstream Canada Ltd.
License Number: 0446255
License Date: 2012-06-04
License Status: Issued
Spud Date: 2012-06-26
Final Drill Date: 2012-07-06
Well Total Depth: 3451.00 m
Surface Hole Latitude: 54.150313
Surface Hole Longitude: -117.225292

For data sources see[1][2]

Well History

Date Event
2012-06-04 Obtained License
2012-06-26 Well Log Performed
2012-06-28 Surface Casing Operation Performed
2012-07-01 Direction Drilling Operation Performed - Deviate
2012-07-03 Direction Drilling Operation Performed - Horizontal
2012-07-03 Well Log Performed
2012-07-06 Finished Drilling
2012-07-06 Well Mode changed to Drilled and Cased
2012-07-08 Liner Casing Operation Performed
2012-07-08 Production Casing Operation Performed
2012-07-09 Rig Released
2012-07-13 Well Log Performed
2012-07-16 Perforation Treatment Performed - Multi-Stage Fracture
2012-07-16 Perforation Treatment Performed - Open-Hole Completion
2012-07-17 Perforation Treatment Performed - Multi-Stage Fracture
2012-07-20 Well Log Performed
2012-08-09 Well Began Production
2012-08-09 Well Fluid changed to Crude Oil
2012-08-09 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-06-26 Trinidad Drilling Ltd. 94 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-07-01 1809.03 Deviate (5 - 79 degrees)
2012-07-03 2249.50 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-07-16 Open Hole/Barefoot Completion 3438.00 3451.00 0
2012-07-16 Multi-Stage Fracture 2894.10 2894.20 0
2012-07-16 Multi-Stage Fracture 2827.60 2827.70 0
2012-07-16 Multi-Stage Fracture 2760.00 2760.10 0
2012-07-16 Multi-Stage Fracture 2691.80 2691.90 0
2012-07-16 Multi-Stage Fracture 2623.80 2623.90 0
2012-07-17 Multi-Stage Fracture 2555.90 2556.00 0
2012-07-17 Multi-Stage Fracture 2487.50 2487.60 0
2012-07-17 Multi-Stage Fracture 2419.70 2419.80 0
2012-07-17 Multi-Stage Fracture 2339.20 2339.30 0
2012-07-16 Multi-Stage Fracture 3433.50 3433.60 0
2012-07-16 Multi-Stage Fracture 3366.10 3366.20 0
2012-07-16 Multi-Stage Fracture 3298.80 3298.90 0
2012-07-16 Multi-Stage Fracture 3231.00 3231.10 0
2012-07-16 Multi-Stage Fracture 3163.10 3163.20 0
2012-07-16 Multi-Stage Fracture 3095.50 3095.60 0
2012-07-16 Multi-Stage Fracture 3028.50 3028.60 0
2012-07-16 Multi-Stage Fracture 2962.10 2962.20 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 2884 0.0 0.0 0.0
2013 8216 0.0 0.0 0.0
2014 8036 0.0 0.0 0.0
2015 7616 0.0 0.0 0.0
2016 7749 0.0 0.0 0.0
2017 8231 0.0 0.0 0.0
2018 6651 0.0 0.0 0.0
2019 2815 0.0 0.0 0.0
2020 1133 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-07-09 No Incident Encountered 0.00 0.00
2012-07-20 No Incident Encountered 0.00 0.00

For data sources see[8]

References