X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0595223008002

Well Details

Well ID: 0595223008002
Loading map...
Location: 00/08-30-059-22W5/2
Location Alias: 00/08-30-59-22 W5M
Location Alias 2: 00/08-30-059-22 W5/02
Country: Canada
Province: Alberta
Township: 059
Meridian: 5
Range: 22
Section: 30
County/Municipality: Municipal District of Greenview No. 16
Well Name: MAPAN ENERGY FIR 8-30-59-22
Operator Name: Tourmaline Oil Corp.
License Number: 0191592
License Date: 1996-09-23
License Status: Issued
Spud Date: 1996-10-13
Final Drill Date: 1996-10-28
Well Total Depth: 2781.00 m
Surface Hole Latitude: 54.129470
Surface Hole Longitude: -117.281148

For data sources see[1][2]

Well History

Date Event
1996-09-23 Obtained License
1996-10-15 Surface Casing Operation Performed
1996-10-28 Finished Drilling
1996-10-28 Well Mode changed to Drilled and Cased
1996-10-29 Well Log Performed
1996-10-31 Production Casing Operation Performed
1996-10-31 Rig Released
1997-01-29 Perforation Treatment Performed - Jet Perforation
1997-01-30 Perforation Treatment Performed - Fractured
1997-03-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-03-18 Plug Back Performed
1997-03-19 Perforation Treatment Performed - Jet Perforation
1997-03-21 Perforation Treatment Performed - Fractured
1997-03-25 Perforation Treatment Performed - Jet Perforation
1997-03-26 Perforation Treatment Performed - Fractured
2002-07-14 Well Log Performed
2002-07-15 Perforation Treatment Performed - Jet Perforation
2002-07-18 Perforation Treatment Performed - Fractured
2002-08-23 Well Began Production
2002-08-23 Well Fluid changed to Gas
2002-08-23 Well Mode changed to Flowing
2002-12-01 Well Fluid changed to Gas
2002-12-01 Well Mode changed to Flowing
2008-07-15 Well Fluid changed to Gas
2008-07-15 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-01-29 Perforation 2726.00 2734.00 20
1997-01-30 Fracture 2726.00 2734.00 0
1997-03-18 Packing Device Capped w/Cement 2712.00 2720.00 0
1997-03-19 Perforation 2642.00 2645.00 20
1997-03-21 Fracture 2642.00 2645.00 0
1997-03-25 Perforation 2221.00 2225.00 20
1997-03-26 Fracture 2221.00 2225.00 0
2002-07-15 Perforation 2357.00 2359.50 17
2002-07-18 Fracture 2357.00 2359.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2002 2879 0.0 0.0 0.0
2003 1021 0.0 0.0 0.0
2004 2555 0.0 0.0 0.0
2005 2669 0.0 0.0 0.0
2006 1813 0.0 0.0 0.0
2007 6590 0.0 0.0 0.0
2008 7659 0.0 0.0 0.0
2009 6668 0.0 0.0 0.0
2010 8279 0.0 0.0 0.0
2011 6840 0.0 0.0 0.0
2012 4388 0.0 0.0 0.0
2013 7369 0.0 0.0 0.0
2014 7893 0.0 0.0 0.0
2015 8567 0.0 0.0 0.0
2016 2316 0.0 0.0 0.0
2018 3048 0.0 0.0 0.0
2019 5135 0.0 0.0 0.0

For data sources see[5]

References