X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0595221010003

Well Details

Well ID: 0595221010003
Loading map...
Location: 00/10-10-059-22W5/3
Location Alias: 00/10-10-59-22 W5M
Location Alias 2: 00/10-10-059-22 W5/03
Country: Canada
Province: Alberta
Township: 059
Meridian: 5
Range: 22
Section: 10
County/Municipality: Municipal District of Greenview No. 16
Well Name: TALISMAN ET AL FIR 10-10-59-22
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0044219
License Date: 1972-11-17
License Status: Issued
Spud Date: 1972-11-22
Final Drill Date: 1972-12-23
Well Total Depth: 2894.40 m
Surface Hole Latitude: 54.089823
Surface Hole Longitude: -117.210113

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1972-11-17 Obtained License
1972-12-17 Drill Stem Test Performed
1972-12-23 Finished Drilling
1972-12-23 Well Mode changed to Drilled and Cased
1972-12-26 Production Casing Operation Performed
1972-12-30 Perforation Treatment Performed - Jet Perforation
1994-12-13 Well Log Performed
1994-12-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-12-14 Perforation Treatment Performed - Jet Perforation
1994-12-14 Plug Back Performed
1994-12-14 Well Log Performed
1994-12-19 Perforation Treatment Performed - Fractured
1995-01-06 Perforation Treatment Performed - Chemical Squeeze
1998-11-08 Perforation Treatment Performed - Jet Perforation
1998-11-12 Perforation Treatment Performed - Fractured
1999-11-08 Perforation Treatment Performed - Jet Perforation
1999-11-10 Perforation Treatment Performed - Fractured
2000-04-17 Well Began Production
2000-04-17 Well Fluid changed to Gas
2000-04-17 Well Mode changed to Flowing
2011-06-01 Well Fluid changed to Gas
2011-06-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1972-12-30 Perforation 2813.30 2816.40 7
1999-11-10 Fracture 2233.60 2237.00 0
1994-12-14 Packing Device Capped w/Cement 2779.00 2787.00 0
1994-12-14 Perforation 2696.30 2703.00 13
1994-12-19 Fracture 2696.30 2703.00 0
1995-01-06 Chemical Squeeze 2696.30 2703.00 0
1998-11-08 Perforation 2722.50 2728.50 17
1998-11-08 Perforation 2730.50 2735.30 17
1998-11-12 Fracture 2722.50 2735.30 0
1999-11-08 Perforation 2233.60 2237.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 5180 0.0 0.0 0.0
2001 7248 0.0 0.0 0.0
2002 7703 0.0 0.0 0.0
2003 7825 0.0 0.0 0.0
2004 8143 0.0 0.0 0.0
2005 7739 0.0 0.0 0.0
2006 8639 0.0 0.0 0.0
2007 8639 0.0 0.0 0.0
2008 8327 0.0 0.0 0.0
2009 3672 0.0 0.0 0.0
2010 6287 0.0 0.0 0.0
2011 8352 0.0 0.0 0.0
2012 8712 0.0 0.0 0.0
2013 8687 0.0 0.0 0.0
2014 8495 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8606 0.0 0.0 0.0
2017 8073 0.0 0.0 0.0
2018 8566 0.0 0.0 0.0
2019 8425 0.0 0.0 0.0
2020 2111 0.0 0.0 0.0

For data sources see[5]

References