X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0595220508022

Well Details

Well ID: 0595220508022
Loading map...
Location: 02/08-05-059-22W5/2
Location Alias: 02/08-05-59-22 W5M
Location Alias 2: 02/08-05-059-22 W5/02
Country: Canada
Province: Alberta
Township: 059
Meridian: 5
Range: 22
Section: 05
County/Municipality: Municipal District of Greenview No. 16
Well Name: TOURMALINE HZ KAYBOBS 8-5-59-22
Operator Name: Tourmaline Oil Corp.
License Number: 0480263
License Date: 2016-08-31
License Status: Amended
Spud Date: 2016-10-09
Final Drill Date: 2016-10-26
Well Total Depth: 3566.90 m
Surface Hole Latitude: 54.080801
Surface Hole Longitude: -117.257451

For data sources see[1][2]

Well History

Date Event
2016-08-31 Obtained License
2016-10-09 Direction Drilling Operation Performed - Deviate
2016-10-10 Surface Casing Operation Performed
2016-10-19 Direction Drilling Operation Performed - Horizontal
2016-10-23 Intermediate Casing Operation Performed
2016-10-26 Finished Drilling
2016-10-26 Well Log Performed
2016-10-26 Well Mode changed to Drilled and Cased
2016-10-27 Liner Casing Operation Performed
2016-10-28 Rig Released
2016-11-14 Perforation Treatment Performed - Multi-Stage Fracture
2016-11-19 Perforation Treatment Performed - Multi-Stage Fracture
2016-11-25 Well Began Production
2016-11-25 Well Fluid changed to Gas
2016-11-25 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2016-10-09 114.20 Deviate (5 - 79 degrees)
2016-10-19 2004.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2016-11-14 Multi-Stage Fracture 3462.70 3462.80 0
2016-11-19 Multi-Stage Fracture 2999.10 2999.20 0
2016-11-19 Multi-Stage Fracture 2946.40 2946.50 0
2016-11-19 Multi-Stage Fracture 2893.60 2893.70 0
2016-11-19 Multi-Stage Fracture 2840.80 2840.90 0
2016-11-19 Multi-Stage Fracture 2788.10 2788.20 0
2016-11-19 Multi-Stage Fracture 3421.10 3421.20 0
2016-11-19 Multi-Stage Fracture 3368.40 3368.50 0
2016-11-19 Multi-Stage Fracture 3315.60 3315.70 0
2016-11-19 Multi-Stage Fracture 3262.90 3263.00 0
2016-11-19 Multi-Stage Fracture 3210.10 3210.20 0
2016-11-19 Multi-Stage Fracture 3157.40 3157.50 0
2016-11-19 Multi-Stage Fracture 3104.70 3104.80 0
2016-11-19 Multi-Stage Fracture 3051.90 3052.00 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-11-14 2016-11-19 2,457 3,186 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 82.9323 N/A
Prime Plus 40/70 Trican hexamethylenetetramine 100-97-0 100 3.5391 N/A
silica crystalline 14808-60-7 100 3.5391 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 11.5211 N/A
Sand 50/140 Trican silica crystalline 14808-60-7 100 1.7805 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0098 N/A
2-mercaptoethanol 60-24-2 100 0.0098 N/A
dibromoacetonitrile 3252-43-5 100 0.0098 N/A
non-hazardous ingredients Not Available 100 0.0098 N/A
sodium bromide 7647-15-6 100 0.0098 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.0885 N/A
water Not Available 100 0.0885 N/A
FR-9 Trican Friction Reducer alcohols. C10-16. ethoxylated 68002-97-1 100 0.0866 N/A
alcohols. C12-14. ethoxylated 68439-50-9 100 0.0866 N/A
alcohols. C12-16. ethoxylated 68551-12-2 100 0.0866 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.0866 N/A
non-hazardous ingredients Not Available 100 0.0866 N/A
S-17W Trican Surfactant ethylene/propylene oxide polymer Not Available 100 0.0416 N/A
methanol 67-56-1 100 0.0416 N/A
water Not Available 100 0.0416 N/A

For data sources see[6]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2016 959 0.0 0.0 0.0
2017 8724 0.0 0.0 0.0
2018 8080 0.0 0.0 0.0
2019 8543 0.0 0.0 0.0
2020 2144 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-10-26 No Incident Encountered 0.00 0.00
2016-11-25 No Incident Encountered 0.00 0.00

For data sources see[8]

References