X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0595211113000

Well Details

Well ID: 0595211113000
Loading map...
Location: 00/13-11-059-21W5/0
Location Alias: 00/13-11-59-21 W5M
Location Alias 2: 00/13-11-059-21 W5/00
Country: Canada
Province: Alberta
Township: 059
Meridian: 5
Range: 21
Section: 11
County/Municipality: Municipal District of Greenview No. 16
Well Name: TALISMAN FIR 13-11-59-21
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0279376
License Date: 2002-12-23
License Status: Issued
Spud Date: 2003-01-18
Final Drill Date: 2003-02-01
Well Total Depth: 2780.00 m
Surface Hole Latitude: 54.093137
Surface Hole Longitude: -117.050631

For data sources see[1][2]

Well History

Date Event
2002-12-23 Obtained License
2003-01-18 Surface Casing Operation Performed
2003-01-19 Direction Drilling Operation Performed - Deviate
2003-02-01 Finished Drilling
2003-02-01 Well Log Performed
2003-02-01 Well Mode changed to Drilled and Cased
2003-02-02 Well Log Performed
2003-02-04 Production Casing Operation Performed
2003-02-05 Rig Released
2003-02-21 Perforation Treatment Performed - Jet Perforation
2003-02-21 Well Log Performed
2003-02-22 Perforation Treatment Performed - Fractured
2003-02-27 Well Log Performed
2003-02-28 Perforation Treatment Performed - Jet Perforation
2003-02-28 Well Log Performed
2003-03-12 Perforation Treatment Performed - Fractured
2003-08-19 Well Began Production
2003-08-19 Well Fluid changed to Gas
2003-08-19 Well Mode changed to Flowing
2003-09-05 Well Fluid changed to Gas
2003-09-05 Well Mode changed to Flowing
2011-06-01 Well Fluid changed to Gas
2011-06-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2003-01-19 875.40 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2003-02-21 Perforation 2729.00 2731.00 17
2003-02-22 Fracture 2729.00 2731.00 0
2003-02-28 Perforation 2667.00 2671.00 17
2003-03-12 Fracture 2667.00 2671.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 2744 0.0 0.0 0.0
2004 8766 0.0 0.0 0.0
2005 8687 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 7323 0.0 0.0 0.0
2008 8567 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8711 0.0 0.0 0.0
2011 6312 0.0 0.0 0.0
2012 2717 0.0 0.0 0.0
2013 8448 0.0 0.0 0.0
2014 6528 0.0 0.0 0.0
2015 7438 0.0 0.0 0.0
2016 6675 0.0 0.0 0.0
2017 7510 0.0 0.0 0.0
2018 6282 0.0 0.0 0.0
2019 6902 0.0 0.0 0.0
2020 2171 0.0 0.0 0.0

For data sources see[6]

References